AZ U:13:254(ASM) (Site Name Keyword)

1-6 (6 Records)

Class I (Overview) Survey Update of the San Carlos Irrigation Drainage District (SCIDD) Joint Works for the U.S. Bureau of Reclamation, Pinal County, Arizona
PROJECT Robert Stokes. USDI Bureau of Reclamation, Phoenix Area Office.

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. To assist with project planning, Reclamation directed Archaeological Consulting Services, Ltd. (ACS)...


Class I (Overview) Survey Update of the San Carlos Irrigation Drainage District (SCIDD) Joint Works for the U.S. Bureau of Reclamation, Pinal County, Arizona: Photo (2009)
IMAGE Archaeological Consulting Services, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. To assist with project planning, Reclamation directed Archaeological Consulting Services, Ltd. (ACS)...


Class I (Overview) Survey Update of the San Carlos Irrigation Drainage District (SCIDD) Joint Works for the U.S. Bureau of Reclamation, Pinal County, Arizona: Report (2009)
DOCUMENT Full-Text Paige B. Florie. Thomas E. Jones. Robert Stokes. Glennda Luhnow.

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. To assist with project planning, Reclamation directed Archaeological Consulting Services, Ltd. (ACS)...


A Class I Cultural Resources Inventory for the Pinal West to Southeast Valley/Browning 500 kV Project, Pinal and Maricopa Counties, Arizona (2004)
DOCUMENT Full-Text Cherie K. Walth.

Greystone Environmental Consultants, Inc., on behalf of Salt River Project Agricultural Improvement and Power District (SRP), has developed this Class I Cultural Resources Inventory for the Pinal West to Southeast Valley/Browning 500 kV Project (Project) as part of the Certificate of Environmental Compatibility (CEC) Application. SRP contracted with Greystone Environmental Consultants, Inc. (Greystone) to complete the Class I report. The Project includes the construction of one single circuit...


A Class I Cultural Resources Records Search for the Proposed Salt River Project Copper Crossing Energy Center, Florence, Pinal County, Arizona (2016)
DOCUMENT Full-Text Gina S. Gage.

Under contract to Salt River Project Agricultural Improvement and Power District (SRP), Northland Research, Inc. (Northland) has completed a Class I cultural resources records search for the proposed SRP Copper Crossing Energy Center (CCEC) generating station located in the Town of Florence, Pinal County, Arizona. The new generating station is intended to meet SRP's projected growth in demand for power. The purpose of this Class I review is to identify and assess any cultural resources located...


A Cultural Resources Survey of a 6-Mile-Long (22.8-Acre) 69 kV Distribution Line Right-of-Way Between the Webber and Watkins Substations, Johnson Ranch, Pinal County, Arizona (2007)
DOCUMENT Full-Text James W. Cogswell.

SRP is planning to construct a 69 kV electrical transmission line between the existing Webber substation and the planned Witherspoon and Watkins substations in the Johnson Ranch area. Logan Simpson Design Inc. conducted a Class III cultural resources survey of the project area. The purpose of the survey was to identify and assess any cultural resources in the parcel prior to construction of the powerline.