AZ U:11:12(ASU) (Site Name Keyword)

1-2 (2 Records)

A Class I Cultural Resources Inventory for the Pinal West to Southeast Valley/Browning 500 kV Project, Pinal and Maricopa Counties, Arizona (2004)
DOCUMENT Full-Text Cherie K. Walth.

Greystone Environmental Consultants, Inc., on behalf of Salt River Project Agricultural Improvement and Power District (SRP), has developed this Class I Cultural Resources Inventory for the Pinal West to Southeast Valley/Browning 500 kV Project (Project) as part of the Certificate of Environmental Compatibility (CEC) Application. SRP contracted with Greystone Environmental Consultants, Inc. (Greystone) to complete the Class I report. The Project includes the construction of one single circuit...


Investigations of Archaeological Sites Along the 500 kV Tonto National Forest Boundary to Kyrene Transmission Line Route, Coronado Station Project, Pinal and Maricopa Counties, Arizona (1977)
DOCUMENT Full-Text John M. Antieau.

This report presents the results of an archaeological survey and subsequent test investigation of sites along the 68 km (42 mi) right-of-way for a proposed 500 KV transmission line from a point on the boundary of the Tonto National Forest northeast of Florence Junction to the existing Kyrene substation south of Tempe, Arizona. The power line will consist of a series of four-legged transmission towers placed at approximately 1700 foot intervals. The right-of-way varies between 30 m (100 ft) and...