This report summarizes the results of an intensive archeological reconnaissance of the proposed Big Bend Reservoir of central South Dakota. The survey was carried out as a part of the continuing program of the Missouri Basin project, Smithsonian Institution, which is directed toward the recovery of aboriginal and historical remains threatened by hydroelectric, flood control, and reclamation development of the Missouri River system. The Big Bend Reservoir will be one of several artificial lakes...
Archeological Progress Report No. 10, Field Season of 1965 (1965)
This is the tenth in a series of annual reports summarizing current field activities within the Missouri River Basin. Twenty-two field parties, representing one federal and five state agencies, participated in the Inter-Agency Archaeological Salvage Program within the Missouri Basin during the summer of 1965. Thirteen parties were fielded by the Missouri Basin Project of the Smithsonian Institution, nine of which worked within the Garrison, Oahe, Big Bend, Fort Randall and Gavins Point...
Archeological Progress Report No. 11, Field Season of 1966 (1966)
This is the eleventh in a series of annual reports summarizing current field activities within the Missouri River Basin under the auspices of the Inter-Agency Archeological Salvage Program. Twelve field parties, representing one federal and four state agencies, participated in the Missouri Basin program during the summer of 1966. Seven parties were fielded by the River Basin Surveys of the Smithsonian Institution, four of which operated along the mainstem in the Upper Oahe and Big Bend...
Archeological Progress Report No. 9, Field Season of 1964 (1964)
This is the ninth in a series of reports presented to provide a summary of current field activities within the Missouri River Basin. Twenty-three field parties, representing one federal and seven state agencies, participated in the Inter-Agency Archaeological Salvage Program within the Missouri Basin during the summer of 1964. Fourteen parties were fielded by the Missouri Basin Project of the Smithsonian Institution. Eleven of these worked within the Oahe, Big Bend, and Fort Randall reservoirs...
Quarterly Progress Report, National Park Service Activities with the Cooperation of the Smithsonian Institution, 1965 (1965)
This document contains three quarterly progress reports from Fiscal Year 1965. These statements are intended to provide the Field Committee with a summary of archeological studies within the Missouri Basin, undertaken by the River Basin Surveys of the Smithsonian Institution in cooperation with the National Park Service and other agencies.
Quarterly Progress Report, National Park Service Activities with the Cooperation of the Smithsonian Institution, 1966 (1966)
This document contains three quarterly progress reports from Fiscal Year 1966. These statements are intended to provide the Field Committee with a summary of archeological studies within the Missouri Basin, undertaken by the River Basin Surveys of the Smithsonian Institution in cooperation with the National Park Service and other agencies.