Addendum: Cultural Resources Survey for the Pinal West to Dinosaur Extra-High Voltage Transmission Line, Pinal County, Arizona (2009)
DOCUMENT Full-Text Connie A. Darby.

The results  of additional Class  3 cultural resources  surveys  for the  Pinal West to  Dinosaur Extra-high Voltage Transmission Line Project are presented in this report. The transmission line  is  being  constructed  by  the  Salt  River  Project Agricultural  Improvement  and  Power District  (SRP);  it  will  link  the  Pinal  West, Santa Rosa,  Pinal Central, Abel, and Dinosaur Substations located in south-central Arizona. The results from the bulk of cultural resources  surveys  for  the...


Anthem at Merrill Ranch: Cultural Resources Inventory of the 3,260-Acre Parcel between Coolidge and Florence, Pinal County, Arizona (2004)
DOCUMENT Full-Text Daniel K. Newsome.

Between October 20 and 23, 2004, archaeologists from EnviroSystems Management, Inc. (EnviroSystems) conducted a Class III cultural resources inventory of 1,568 acres of private land between Coolidge and Florence, Pinal County, Arizona. The 1,568 acres are part of a 3,260-acre parcel proposed for residential development (the remaining 1,692 acres were not examined during this project because 442 acres of the parcel were under cotton cultivation at the time of the inventory and the other 1,250...


A Class I Cultural Resources Inventory of Approximately 5,820 Acres, Results of Relocation and Evaluation of Fourteen Cultural Resource Sites, for the Proposed Merrill Ranch Development near Florence, Pinal County, Arizona (2004)
DOCUMENT Full-Text Laurene Montero. Erin Davis. Michael Stubing. Korri Turner.

This document presents the results of a class I cultural resources inventory and the results of the relocation and evaluation efforts for 14 previously recorded cultural resource sites located within the proposed Merrill Ranch residential community near Florence, Pinal County, Arizona (Figure 1). Vanguard Properties requested that Carter & Burgess, Inc. (C&B) conduct the inventory and relocation as part of the application process to obtain a permit from the United States Army Corp of Engineers...


Cultural Resources Survey for the Pinal West to Dinosaur Extra-High Voltage Transmission Line, Pinal County, Arizona (2009)
DOCUMENT Full-Text T. Kathleen Henderson. Michael W. Lindeman. Tiffany C. Clark.

Class III cultural resources survey for an extra-high voltage transmission line connecting the Pinal West, Santa Rosa, Pinal Central, Abel, and Dinosaur Substations in Pinal County, Arizona.


A Cultural Resources Survey of 3.5 Miles Along the Riggs Road Alignment, Queen Creek, Maricopa and Pinal Counties, Arizona (2006)
DOCUMENT Full-Text J. Scott Courtright.

EPS Group Inc. (EPS) requested that Logan Simpson Design Inc. (LSD) perform a Class III cultural resources survey along an undeveloped alignment of Riggs Road in Queen Creek, Maricopa and Pinal counties, Arizona. The Town of Queen Creek is planning to construct a four-lane, divided rural roadway along the Riggs Road alignment using funds from the FHWA administered by the ADOT Local Government Section. The roadway will have a raised median and will be built within existing undeveloped land and...


A Cultural Resources Survey of Approximately 1,346 Acres of Private Land Within the Proposed Merrill Ranch Development Near Florence, Pinal County, Arizona (2004)
DOCUMENT Full-Text Michael Stubing. Korri Turner. Erin Davis.

Carter & Burgess, Inc.  (C&B) conducted a Class III,  non collection  cultural  resources survey of approximately  1,346 acres of privately owned  land within the  proposed  Merrill Ranch development,  located  northwest of Florence,  Pinal County, Arizona  (Figure  1). The survey was conducted at the request of Vanguard  Properties as part of ongoing efforts to determine whether significant cultural  resources exist within the Merrill  Ranch development,  prior to the proposed construction  of...


Draft Class I Cultural Resources Overview - Abel-Moody 230kV Transmission Project, Maricopa and Pinal Counties, Arizona (2008)
DOCUMENT Full-Text Heather Duncan.

Salt River Project (SRP) plans to construct a double-circuit, 230-kilovolt (kV) transmission line and a new substation, known as RS-24, to reinforce the local, existing electric transmission system by providing an alternate 230kV transmission loop between the new Abel Substation and Moody Substation, which will substantially improve system reliability and performance. The new transmission line is expected to be approximately 20 miles in length, depending on the selected alternative. The...


Tracks through Time: Urban Archaeology along the METRO Light Rail Corridor, Volume I: Introduction, Background, and Preliminary Field Studies (2011)
DOCUMENT Full-Text Uploaded by: system user

This book presents the results of the archaeological investigations that were conducted along then Light Rail route before and during its construction. As with any project that receives federal funding, METRO was legally required to undertake archaeological investigations along the project corridor; but production of this volume reflects not only METRO's commitment to legal compliance with environmental laws, but also the commitment of the cities of Phoenix, Tempe, and Mesa to preserve and...


Tracks through Time: Urban Archaeology along the METRO Light Rail Corridor, Volume IV, Part 1: Technical Analyses and Material Culture (2011)
DOCUMENT Full-Text Uploaded by: system user

This book presents the results of the archaeological investigations that were conducted along then Light Rail route before and during its construction. As with any project that receives federal funding, METRO was legally required to undertake archaeological investigations along the project corridor; but production of this volume reflects not only METRO's commitment to legal compliance with environmental laws, but also the commitment of the cities of Phoenix, Tempe, and Mesa to preserve and...