AZ AA:1:95 (ASM) (Site Name Keyword)

1-5 (5 Records)

A Class I Cultural Resources Inventory for the Pinal West to Southeast Valley/Browning 500 kV Project, Pinal and Maricopa Counties, Arizona (2004)
DOCUMENT Full-Text Cherie K. Walth.

Greystone Environmental Consultants, Inc., on behalf of Salt River Project Agricultural Improvement and Power District (SRP), has developed this Class I Cultural Resources Inventory for the Pinal West to Southeast Valley/Browning 500 kV Project (Project) as part of the Certificate of Environmental Compatibility (CEC) Application. SRP contracted with Greystone Environmental Consultants, Inc. (Greystone) to complete the Class I report. The Project includes the construction of one single circuit...


Cultural Resources Survey for the Pinal West to Abel/Browning 500 kV Transmission Line, Arizona State Lands Segments, Santa Rosa Substation to Dinosaur Substation, Pinal County, Arizona (2008)
DOCUMENT Full-Text T. Kathleen Henderson. Tiffany C. Clark. Connie A. Darby.

This report presents the results of a Class III cultural resources survey of Arizona State Land right-of-way easements for a new extra-high voltage transmission line to be built between the Santa Rosa Substation, located south of the Ak Chin Indian Community, and the Dinosaur Substation, located east of the Town of Queen Creek, in Pinal County, Arizona (Figure 1). The proposed transmission line is part of the larger Pinal West to Abel/Browning (PW-ABL/BRG) 500 kV Transmission Line Project. The...


Cultural Resources Survey for the Pinal West to Dinosaur Extra-High Voltage Transmission Line, Pinal County, Arizona (2009)
DOCUMENT Full-Text T. Kathleen Henderson. Michael W. Lindeman. Tiffany C. Clark.

Class III cultural resources survey for an extra-high voltage transmission line connecting the Pinal West, Santa Rosa, Pinal Central, Abel, and Dinosaur Substations in Pinal County, Arizona.


A Cultural Resources Survey of Approximately 13 Acres for Wire Pulling Locations for a New SRP 230-kV Transmission Line from Kortsen Road to Thornton Road, Casa Grande, Pinal County, Arizona (2013)
DOCUMENT Full-Text Justin P. Rego.

Salt River Project Agricultural Improvement and Power District (SRP) requested that Logan Simpson Design Inc. (LSD) perform a Class III cultural resources survey prior to anticipated staging of 18 wire pulling locations for a new 230-kV transmission line from Kortsen Road to Thornton Road for the Desert Basin Generating Station, west of Casa Grande in Pinal County. The Class III survey was undertaken to identify, document and evaluate the Arizona/National Register of Historic Places (A/NRHP)...


A Cultural Resources Survey of Approximately 3 Miles for a New SRP 230-kV Transmission Line from Kortsen Road to Thornton Road for the Desert Basin Generating Station, Casa Grande, Pinal County, Arizona (2009)
DOCUMENT Full-Text Jackie L. Orcholl.

SRP requested that Logan Simpson Design (LSD) conduct a Class III cultural resources survey of a new right-of-way (ROW) to determine whether any significant cultural resources will be disturbed by the construction of a 230-kV transmission line. SRP also requested that LSD evaluate portions of four previously recorded sites that are within an existing Western 115-kV transmission line ROW. The new 230-kV transmission line will replace the existing Western line as part of the current project.