AZ EE:3:53 (ASM) (Site Name Keyword)

1-2 (2 Records)

A Cultural Resource Survey for Proposed Water Pipelines and Evaporation Ponds for the Desert Basin Power Plant, Casa Grande, Pinal County, Arizona (2000)
DOCUMENT Full-Text A.E. (Gene) Rogge.. Rachel Davies. Carmen Costner. Cara Lonardo. Sharon K. Bauer.

Reliant Energy, Inc. plans to install water supply and discharge facilities to serve the Desert Basin Power Plant now under construction in Casa Grande, Arizona. A buried water supply pipeline, approximately 9 miles long, would be used to convey Central Arizona Project water to the power plant from the East Main Canal of the Maricopa-Stanfield Irrigation District. A buried water discharge pipeline, about 3.5 miles long, would be used to transport wastewater from the cooling towers at the power...


The El Paso Natural Gas Line No. 2000 Conversion Project: An Archaeological Re-Survey of the Former All American Pipeline Across La Paz, Yuma, Maricopa, Pinal, Pima, and Cochise Counties, Arizona (2000)
DOCUMENT Full-Text Chris D. North.

In April and May 2000, SWCA, Inc., Environmental Consultants (SWCA) conducted cultural resource surveys for EPNG's Line No. 2000 Project, surveying the former All American Pipeline in Cochise, La Paz, Maricopa, Pima, and Pinal counties for the Arizona segment. At the request of EPNG, SWCA began the cultural resources survey for this project in April 2000 in support of an Environmental Assessment (EA) being prepared by ENSR, Inc., in conjunction with a pipeline acquisition, conversion, operation...