AZ AA:12:51 (ASM) (Site Name Keyword)

1-2 (2 Records)

Phase I Data Recovery at Eight Sites along the Estrella-Stockham Segment of the Union Pacific Railroad in Pima, Pinal, and Maricopa Counties, Arizona (2008)
DOCUMENT Full-Text Joseph A. Ezzo. David M. R. Barr. Douglas R. Mitchell.

The Union Pacific Railroad (UPRR) has planned a major construction effort within its 200-foot-wide right-of-way (ROW) throughout much of Arizona. The UPRR Sunset Accelerated Capacity Project includes construction of a second rail line running from Tucson (in Pima County) to Yuma (in Yuma County), as well as renovations to the existing line, such as construction of new bridges and culverts. A Section 404 permit requires that the U.S. Army Corps of Engineers (USACE) consider the cultural resources...


A San Pedro Phase Agricultural Field and Early Ceramic Period Occupations in the Middle Santa Cruz Valley, Southern Arizona: Investigations at the Stewart Brickyard and Rillito Loop Sites (2013)
DOCUMENT Full-Text Uploaded by: adam brin

Arizona Department of Transportation (ADOT) proposed widening Interstate 10 (I-10) in northern Pima County, Arizona. Desert Archaeology, Inc., was contracted to mitigate the potential effects construction would have on significant cultural resources. A phased data recovery program was completed that addressed construction impacts at five archaeological sites along the l-10 corridor. Phase 1, exploratory trenching, tested for subsurface deposits at AZ AA:12:51 (ASM), AA:12:252 (ASM), AZ AA:12:486...