Charcoal Stain (Site Type Keyword)

26-31 (31 Records)

Life on the Lehi Terrace: The Archeology of the Red Mountain Freeway Between State Route 87 and Gilbert Road, Appendix J (2004)
DATASET Bruce G. Phillips.

The Arizona Department of Transportation (ADOT) is in the process of extending the Red Mountain Freeway (Loop 202) through Mesa, Arizona from State Route (SR) 87 to US Highway 60 (US 60, Superstition Freeway). The undertaking entails the construction of 17.8 mi (28.6 km) of new limited access six-lane freeway parallel to and south of the Salt River. Under contract to Entranco Engineering, Archaeological Consulting Services, Ltd.(ACS) performed initial survey of the proposed alternatives...


Life on the Lehi Terrace: The Archeology of the Red Mountain Freeway Between State Route 87 and Gilbert Road, Appendix K (2004)
DATASET Manuel Palacios-Fest.

The Arizona Department of Transportation (ADOT) is in the process of extending the Red Mountain Freeway (Loop 202) through Mesa, Arizona from State Route (SR) 87 to US Highway 60 (US 60, Superstition Freeway). The undertaking entails the construction of 17.8 mi (28.6 km) of new limited access six-lane freeway parallel to and south of the Salt River. Under contract to Entranco Engineering, Archaeological Consulting Services, Ltd.(ACS) performed initial survey of the proposed alternatives...


Life on the Lehi Terrace: The Archeology of the Red Mountain Freeway Between State Route 87 and Gilbert Road, Appendix M (2004)
DATASET Bruce G. Phillips.

The Arizona Department of Transportation (ADOT) is in the process of extending the Red Mountain Freeway (Loop 202) through Mesa, Arizona from State Route (SR) 87 to US Highway 60 (US 60, Superstition Freeway). The undertaking entails the construction of 17.8 mi (28.6 km) of new limited access six-lane freeway parallel to and south of the Salt River. Under contract to Entranco Engineering, Archaeological Consulting Services, Ltd.(ACS) performed initial survey of the proposed alternatives...


Salt River Project, Coronado Generating Station, Ash Disposal Area and Evaporation Pond Site on Private Lands, Apache County, Arizona: Interim Report for Phase II and Phase III Operations in the Ash Disposal and Evaporation Pond Site for the Salt River Project Coronado Station, A 76-6 (1976)
DOCUMENT Full-Text Eileen Camilli.

Between February 18, 1976 and April 25, 1976 archaeological field work was conducted on the Coronado Generating Station ash disposal area and evaporation pond site for the Salt River Project, During this time 3.25 square miles were surveyed and 33 sites recorded. In addition to the fieldwork, analytical and write up phases of the project were carried out between May 3 and July 19, 1976. These phases provide a description and analysis of archaeological sites and artifactual materials from the...


Settlement, Subsistence, and Specialization In the Northern Periphery: The Waddell Project. Vols. 1 and 2 (1989)
DOCUMENT Full-Text Uploaded by: system user

Under the sponsorship of the Bureau of Reclamation, the New Waddell Dam Borrow Areas Mitigative Data Recovery Project, more simply known as the Waddell Project, performed data recovery at 17 sites in the vicinity of Lake Pleasant, Arizona. Supplemental surveys conducted under the same contract added two sites to the inventory slated for investigation. The project area, composed of multiple survey areas, was spread across two drainages, the Agua Fria and New River, in what is considered the...


Tucson Aqueduct-Phase B, Central Arizona Project, Archaeological Data Recovery Studies, 1985-1986 Annual Report (1987)
DOCUMENT Full-Text Jon S. Czaplicki.

Arizona State Museum's 1985-1986 Annual Report is a summary of the field­work and activities during the first contract year of the Tucson Aqueduct-Phase B, Mitigative Data Recovery Study in the Avra Valley. Management information and research results of the 15 Hohokam sites investigated are presented in this report. The plan of work for 1986-1987 involving field­work, analyses, report preparation and miscellaneous projects are also discussed in the annual report.