Recovery technique (Shell Mound Archaeological Project)

Summary

Field recovery technique and screen size.

Cite this Record

Recovery technique (Shell Mound Archaeological Project). George Crothers. 2016 ( tDAR id: 401210) ; doi:10.6067/XCV80003PN

This Resource is Part of the Following Collections

Ontology: EAFWG Recovery Method Ontology

Category: Provenience and Context

Subcategory: Recovery Method

Coding Rules

Code Term Description Mapped Ontology Node
C control block trowel with hand-picking
D4 dry screen 1/4 inch 1/4\" , 6.35 mm screen
F4 flotation heavy fraction 1/4 inch 1/4\" , 6.35 mm screen
W16 water screen 1/16 inch 1/16\", 1.588 mm screen
W2 water screen 1/2 inch 1/2\", 12.7 mm screen
W4 water screen 1/4 inch 1/4\" , 6.35 mm screen
Special Coding Rules: These entries are not in the coding-sheet, but represent edge-cases in Data Integration that may benefit from custom mappings
MISSING
NULL
UNMAPPED

Individual & Institutional Roles

Contact(s): George Crothers

File Information

  Name Size Creation Date Date Uploaded Access
Recovery-technique--Shell-Mound-Archaeological-Project.csv 163.00b Feb 2, 2017 4:42:11 AM Public