The National Archeological Database—a computerized communications network for the archeological and historic preservation community—was established to improve access to information on archeological activities nationwide.
Site Name Keywords
CA-SBr-2102 •
CA-RIV-150 •
CA-SBr-93 •
CA-SBr-434 •
CA-RIV-1180 •
CA-SBr-2162 •
CA-RIV-127 •
CA-RIV-333 •
CA-RIV-652 •
CA-RIV-653
Site Type Keywords
Resource Extraction / Production / Transportation Structure or Features •
Road, Trail, and Related Structures or Features •
Bridge •
Archaeological Feature •
Agricultural or Herding •
Village •
Reservoir •
Artifact Scatter •
Trail •
Mine
Other Keywords
Cultural Resource •
Archaeological Survey •
Archeological Survey •
Prehistory •
Significance / Management •
Significance •
No Cultural Resources •
Reconnaissance •
Site Settlement •
Cultural Resource Survey
Culture Keywords
Archaic •
Woodland •
Late Archaic •
Historic •
Hist N Nat Amer •
Late Woodland •
Paleo-Indian •
Euroamerican •
Mississippian •
Middle Woodland
Investigation Types
Site Evaluation / Testing •
Archaeological Overview •
Reconnaissance / Survey •
Data Recovery / Excavation •
Collections Research •
Systematic Survey •
Historic Background Research •
Methodology, Theory, or Synthesis •
Bioarchaeological Research •
Environment Research
Material Types
Chipped Stone •
Ceramic •
Fauna •
Ground Stone •
Metal •
Shell •
Fire Cracked Rock •
Glass •
Human Remains •
Mineral
Temporal Keywords
Historic •
Prehistoric •
1900-1750 Ad •
1499-1000 Ad •
1000-500 Ad •
Proto-Historic •
19th Century •
18th Century •
499-0 Ad •
Historic Period
Geographic Keywords
North America (Continent) •
United States of America (Country) •
US (ISO Country Code) •
California (State / Territory) •
Colorado (State / Territory) •
New Mexico (State / Territory) •
Wyoming (State / Territory) •
Utah (State / Territory) •
Florida (State / Territory) •
Nevada (State / Territory)
Resources Inside This Collection (Viewing 5,301-5,400 of 175,074)
- Documents (175,074)
- Phase I Cultural Resource Assessment of the Hindsfield Ridge and Goodin Ridge Timber Sales and the First Half FY-94 Non-Timber Projects On the Somerset Ranger District, Daniel Boone National Forest, Pulaski and McCreary Counties, Kentucky (1994)
- Phase I Cultural Resource Assessment of the Kentucky Utilities Trespass On the Redbird Ranger District, Daniel Boone National Forest, Clay County, Kentucky (1994)
- Phase I Cultural Resource Assessment of the Laird Orr Land Exchange, Leslie, McCreary, and Pulaski Counties, Daniel Boone National Forest (1994)
- A Phase I Cultural Resource Assessment of Two Timber Related Projects and Seven Non-Timber Projects in Jackson, Menifee, Powell and Wolfe Counties, KY, on the Berea and Stanton Ranger Districts, Daniel Boone National Forest (1994)
- Phase I Cultural Resource Evaluation For a Portion of Lot 20, Phase II Jonata Springs Ranch, Santa Barbara County, California (1994)
- Phase I Cultural Resource Evaluation For a Portion of Lot 4, Rancho Saguaro Subdivision, Santa Barbara County, California (1994)
- Phase I Cultural Resource Evaluation For Nextel Communications' proposed Red Rocks Transceiver Facility On Rio Ynez Ranch, Santa Barbara County, CA (1994)
- Phase I Cultural Resource Evaluation For the Proposed Hollister Avenue Bridge Replacement Project Near Santa Barbara Municipal Airport , Santa Barbara, California (1994)
- Phase I Cultural Resource Investigations For Proposed Improvements at Union Slough National Wildlife Refuge, Kossuth County, Iowa (1994)
- Phase I Cultural Resource Literature Search for the Fai-33-0.00 / 1.20 Corridor Study in Bloom, Greenfield, Hocking and Violet Townships, Fairfield County and Madison Township, Franklin County (Pid 13281) (1994)
- Phase I Cultural Resource Reconnaissance of the Proposed Scott Street Realignment at Cherry Street For the Buckeye Basin Greenbelt Parkway (1994)
- Phase I Cultural Resource Reconnaissance Survey of a Coal Mining Support Area Near the Community of Stanhope, Webster County, Kentucky (1994)
- Phase I Cultural Resource Reconnaissance Survey of a Proposed Edible Oil Extraction Plant and Loading / Unloading Facility Along the Left Bank of the Ohio River, Mile 758.1, Owensboro, Daviess County, Kentucky (1994)
- Phase I Cultural Resource Reconnaissance Survey of a Proposed Fleeting Area On the Left Bank of the Ohio River, Between River Mile 896.5 and Mile 897.0, Livingston County, Kentucky (1994)
- Phase I Cultural Resource Reconnaissance Survey of a Surface Mining Coal Extraction Area Near the Community of McHenry, Ohio County, Kentucky (1994)
- Phase I Cultural Resource Survey of a 0.3 Acre Borrow Site Located Near Harrodsburg, Mercer County, Kentucky (1994)
- Phase I Cultural Resource Survey of a 1.3 Acre Power Substation Located Near Mariba, Menifee County, Kentucky (1994)
- Phase I Cultural Resource Survey of a 100 X 100 Foot Water Tabk Site, Albany, Clinton County, Kentucky (1994)
- A Phase I Cultural Resource Survey of a 17.4 Mile Realignment of US231, Bowling Green to Scottsville, Warren and Allen Counties, Kentucky (1994)
- Phase I Cultural Resource Survey of a 20 Acre Storage Facility Located Near Melbourne, Campbell County, Kentucky (1994)
- Phase I Cultural Resource Survey of a 28 Acre Addition To the Maysville / Mason County Landfill, Mason County, Kentucky (1994)
- Phase I Cultural Resource Survey of a 30 Acre Industrial Development Located Near Somerset, Pulaski County, Kentucky (1994)
- Phase I Cultural Resource Survey of a 5.5 Mile Highway Corridor, Shepherdsville, Bullitt County, Kentucky (1994)
- Phase I Cultural Resource Survey of a Four Acre Housing Project Located in Harrodsburg, Mercer County, Kentucky (1994)
- Phase I Cultural Resource Survey of a One Acre Borrow Site Located At, MT. Zion, Clark County, Kentucky (1994)
- Phase I Cultural Resource Survey of a One Acre Electric Substation Located at Coxs Creek, Nelson County, Kentucky (1994)
- Phase I Cultural Resource Survey of a Portion of Turkeyfoot / Bristow Road (KY 1303), Boone and Kenton County, Kentucky (1994)
- Phase I Cultural Resource Survey of a Two Mile Highway Corridor, Bowling Green, Warren County, Kentucky (1994)
- Phase I Cultural Resource Survey of Alternate 3 of the Proposed Realignment of US 460, Morgan County, Kentucky (1994)
- Phase I Cultural Resource Survey of an Eight Acre Electric Substation and Additional Survey at 15Cr122, Carter, Carter County, Kentucky (1994)
- Phase I Cultural Resource Survey of Four Recreation Projects On the London Ranger District, Daniel Boone National Forest, Laurel, Rockcastle, and Whitley Counties, Kentucky (1994)
- Phase I Cultural Resource Survey of the 2.5 Acre Richardson Electric Substation Located Near Independence, Kenton County, Kentucky (1994)
- Phase I Cultural Resource Survey of the Chatteroi Street Connector, Ashland, Boyd County, Kentucky (1994)
- Phase I Cultural Resource Survey of the Craigs Creek Timber Sale On the London Ranger District, Daniel Boone National Forest, Laurel County, Kentucky (1994)
- A Phase I Cultural Resource Survey of the Pounder Branch Timber Sale on the London Ranger District, Daniel Boone National Forest, Laurel County, Kentucky. London Ranger District Archaeological Report 9 (1994)
- Phase I Cultural Resource Survey of the Proposed Prichard Place Replacement Project On the Fort Knox Military Reservation, Hardin and Meade Counties, Kentucky (1994)
- Phase I Cultural Resource Survey of the Scout Camp Timber Sale On the London Ranger District, Daniel Boone National Forest, Laurel County, Kentucky (1994)
- Phase I Cultural Resource Survey of the US 27 Highway Corridor Near Burnside, Pulaski County, Kentucky (1994)
- A Phase I Cultural Resource Survey of Two Water Tank Sites Near Monticello, Wayne County, Kentucky (1994)
- Phase I Cultural Resource Survey, Proposed Road Improvements and Water Wells (Exxon Company) (1994)
- Phase I Cultural Resources Assessment of Riverside Grand Prix, 245.57 Acres of Land Near Perris, Riverside County, California (1994)
- Phase I Cultural Resources Assessment of Specific Plan 281 Amendment (1994)
- Phase I Cultural Resources Assessment of Tentative Parcel Map 28040 (1994)
- Phase I Cultural Resources Assessment of Tentative Tract Map 26798 (1994)
- Phase I Cultural Resources Final Report For the Proposed Mountain View Residential Development (1994)
- Phase I Cultural Resources Investigation Tentative Parcel Map, 2950 East Valley Road, Montecito, CA (APN 155-120-007, -008, -047, -049) (1994)
- Phase I Cultural Resources Investigation TM 14,335 APN 105-210-005, -006, -007 Orcutt CA (1994)
- Phase I Cultural Resources Investigations of a Proposed Replacement Access Road, Ashland County, Ohio (1994)
- Phase I Cultural Resources Letter Report, 1425 Los Positas Road, Santa Barbara (1994)
- Phase I Cultural Resources Management Investigations of a 1,372 Meter Water Supply Line Right-Of-Way For the Village of Cadiz, Ohio Designated As the Muskingum Watershed Conservancy District Project Area in Stock Township, Harrison County, (1994)
- Phase I Cultural Resources Report For Approximately One Acre of County Property, Proposed For Deep Mine Subsidence Control, Richland Township, Belmont County, Ohio (1994)
- Phase I Cultural Resources Report Two Proposed Duplexes 222 South Voluntario Street, Santa Barbara (1994)
- Phase I Cultural Resources Report, Proposed Remodel For Resident Services Offices, 812-814 Laguna Street, Santa Barbara, CA (1994)
- Phase I Cultural Resources Study Along Sycamore Canyon Road, Santa Barbara County, CA (1994)
- Phase I Cultural Resources Survey of 88 Acres at the S.P. Milling Sisquoc Plant For the Proposed Sisquoc River Aggregate Mining Plan. Sisquoc, Santa Barbara County, California (1994)
- Phase I Cultural Resources Survey of Five Proposed School Gymnasium Project Areas On the Fort Knox Military Reservation, Hardin and Meade Counties, Kentucky (1994)
- Phase I Investigation of Cultural Resources at the Davidson Industrial Site At Ivel in Floyd County, Kentucky (1994)
- Phase I Literature Review and Field Investigation For the Proposed Mud Hen Marsh Nature Works in Genoa Township, Delaware County, Ohio (1994)
- Phase I Literature Review and Field Reconnaissance of a Proposed Coal Mining Area, Salt Lick Township, Perry County, Ohio, Permit Application No. 1347 (1994)
- Phase I Literature Review and Reconnaissance Survey For the Proposed Davidson Road / 138 Kv Extension, Norwich Township, Franklin County, OH (1994)
- Phase I Literature Review of the Olympic Steel Warehouse Project Area, Bedford Heights, Cuyahoga County, Ohio (1994)
- Phase I Literature Search, Records Check and Field Check of Approximately 60 Miles of Proposed Water Lines in Ross County, Ohio (1994)
- Phase I Literature Survey and Archaeological Field Reconnaissance of a Proposed Development Area in Washington Township, Franklin County, Ohio: Tuttle Parke Apartments (1994)
- Phase I Literature Survey and Archaeological Reconnaissance of a Proposed Strip Mine Area, Coal Valley, Huntington Township, Gallia County, Ohio (1994)
- Phase I Literature Survey and Field Reconnaissance (Locational Survey) of a Proposed Strip Mine Area in Salem Township, Tuscarawas County, Ohio, Permit Application No. 1340 (1994)
- Phase I Reconnaissance Archaeological Survey of a Surface Mining Coal Extraction Area Near Aetnaville, Ohio County, Kentucky (1994)
- Phase I Reconnaissance Archaeological Survey of a Surface Mining Coal Extraction Area Within the Rose Creek Drainage, Hopkins County, Kentucky (1994)
- Phase I Reconnaissance Survey of Cultural Resources in a Surface Mining Permit Area Near the Community of Hebbardsville, Henderson County, Kentucky (1994)
- Phase I Survey of Six Tracts Within the Cypress Creek National Wildlife Refuge, Alexander, Pulaski, and Union Counties, Illinois and Phase II of Site 11-U-682, Union County, Illinois (1994)
- Phase I Survey of the Ohio Portion of the New Alignment of Alternate 3 For the Proposed Maysville Aa New Ohio River Bridge, Mason County, KY - Brown County, OH (1994)
- Phase I, II, and III Archaeological Investigations of the Proposed Uranium Soils Infiltration Study, Hamilton County, Ohio (1994)
- Phase I-III Cultural Resources Investigations of the Proposed Forced Relocation of Line L-501 in Strongsville Township, Cuyahoga County, Ohio (1994)
- Phase I-III Cultural Resources Investigations of the Public Water Supply Project in Hamilton and Butler Counties, Ohio (1994)
- Phase II Archaeological Investigation at the Carter Road and New US 60 Bypass Interchange Project (15DA150), Owensboro, Daviess County, Kentucky (1994)
- Phase II Archaeological Investigation of CA-Riv-63 and CA-Riv-4214, Specific Plan 281 (1994)
- Phase II Archaeological Reconnaissance of the Dennis Section of the Russellville-Bowling Green 8" Pipeline in Logan County, Kentucky (1994)
- Phase II Archaeological Survey of the Proposed Access Roadway at the Sarah James Corporate Park, Lick Township, Jackson County, Ohio (35-14.88) (1994)
- Phase II Archeological Investigations at a Proposed Landfill Near Elizabethtown, Hardin County, Kentucky (1994)
- Phase II Cultural Resources Reconnaissance Survey of the Proposed Interagency Employees Corporation Child Care Center in Springfield Township, Ross County, Ohio (1994)
- Phase II Evaluative Testing of Portions of Site 33 Fr 1157 of the Davidson Road Substation Assessment, Norwich Township, Franklin County, Ohio (1994)
- Phase II National Register Evaluation of 15CK440 Located in the Proposed Winchester Industrial Park (Phase IV), Clark County, Kentucky (1994)
- Phase II National Register Evaluation of the Otter Creek Archaeological Site, 15HK176, Hopkins County, Kentucky (1994)
- Phase II Stabilization of the Sound Democrat Mill (5Sa349) (1994)
- Phase II Test Excavations at Site 1Cs153 in Connection with Alabama Power Company's General Public Use Site No. 8 in Southeastern Coosa County, Alabama (1994)
- Phase II Testing 15Ck453, a Multicomponent Lithic Scatter in Clark County, Kentucky (1994)
- Phase II Testing at Sites 15Hd249, 15Hd253, and 15Hd420 in the Right-Of-Way of KY Route 313, Hardin County, Kentucky (1994)
- Phase II Testing of 15Cu22 for the Proposed River Oaks Apartments at Burkesville in Cumberland County, Kentucky (1994)
- Phase II Testing of a Portion of 15HT70 Located Near Bonnieville, Hart County, Kentucky (1994)
- Phase III Archaeological Investigation of the Yellowbank Site (15BC164) in Breckinridge County, Kentucky (1994)
- Phase III Archaeological Testing of Sites 33Cl277 and 33Cl279 Along a Proposed Sanitary Trunk Sewer Pipeline Corridor For Urs Consultants, Inc. in Clark County, Ohio (1994)
- Phase III Assessment of Sites 33 Mu 525 and 33 Mu 529 For the Proposed Route 60 Relocation in Muskingum County, Ohio (1994)
- Phase III Assessment of Sites 33 Ro 555, 33 Ro 557, and 33 Ro 565 in Springfield Township, Ross County, Ohio (1994)
- Phase III Cultural Resources Assessment of Site #33-VI-391, 33-VI-392, 33-VI-393, 33-VI-394 and 33-VI-395 For the Vin-50-8.07 (Pid 5213) Bridge Replacement and Road Realignment Project, Richland Township, Vinton County, Ohio (1994)
- Phase III Data Recovery at the Elmore Site (CA-IMP-6427) Imperial County, California - 11-IMP-86, P.M. 33.6 / 43.2, 11221-194860, 11221-100710 (1994)
- Phase Two Investigations of the 909 Land Exchange Tracts On the London Ranger District (1994)
- Phases I and II Archaeological and Historical Study of the Proposed Kattine FMHA Subdivision in Ripley, Brown County, Ohio (1994)
- Philadelphia Creek Replacement Project: Class II Inventory and Treatment Plan For 5Rb.3042 (1994)
- Piceance Lateral In the Vicinity of Little Spring Creek (1994)
- Piceance-To-Parachute Pipeline (Gri No. 9435) (1994)
- Picketwire Canyonlands: Interim Management Direction (Final) (1994)