Stabilization Procedure and Equipment

Summary

This document is a detailed description of the materials needed and procedures outlined for stabilization of prehistoric structures at Casa Grande Ruins National Monument. Featured is a mixing procedure that includes the formula mixture of amendment, soils and sand. There are details of application timing and consequences in mixing and applying incorrect mix formulas.

Cite this Record

Stabilization Procedure and Equipment. 1980 ( tDAR id: 371720) ; doi:10.6067/XCV8S46Q23

This Resource is Part of the Following Collections

Spatial Coverage

min long: -111.542; min lat: 32.981 ; max long: -111.524; max lat: 33.018 ;

Individual & Institutional Roles

Contact(s): alycia hayes

File Information

  Name Size Creation Date Date Uploaded Access
a1980s_amendedmudprocedure.pdf 579.26kb Nov 7, 2011 9:57:29 AM Public

This Resource is Part of the Following User Created Collections