Repair/Rehab Project J80, Replace Vault Toilets

Author(s): Bruce P. Bessken; Jay Shuler

Year: 1989

Summary

Fieldwork was carried out to inventory four areas that will be disturbed by replacement of pit toilets with vault toilets. Investigators looked for surface evidence of cultural materials that may indicate the presence of significant cultural resources, the need for additional exploration, or a change of project site location prior to disturbance of the area from the installation of new vault toilets. Each vault installation will require excavation of a hole approximately four feet deep by five feet wide by nine feet long. In addition, two cement supports to hold the toilets will extend about eighteen inches deep and five feet from the end of the vault excavation.

Cite this Record

Repair/Rehab Project J80, Replace Vault Toilets. Bruce P. Bessken, Jay Shuler. 1989 ( tDAR id: 398820) ; doi:10.6067/XCV87P91H2

This Resource is Part of the Following Collections

Spatial Coverage

min long: -102.722; min lat: 43.389 ; max long: -100.767; max lat: 44.481 ;

Individual & Institutional Roles

Contact(s): Anne Vawser

Contributor(s): Bruce P. Bessken; Jay Shuler

Prepared By(s): Badlands National Park

Record Identifiers

Contract No.(s): CS-1200-8-S064