Data Recovery Plan for AZ U:10:123 (ASM) Within the Proposed Red Mountain Freeway Corridor, Mesa, Maricopa County, Arizona

Summary

This document presents a data recovery plan to mitigate adverse effects to cultural resources within AZ U:10:123 (ASM) that will result from construction of the proposed Red Mountain Freeway (RMF), Gilbert Road to Higley Road segment in Mesa, Maricopa County, Arizona (Figure 1). The data recovery will be completed by Entranco, and was requested by the Arizona Department of Transportation (ADOT). The project is to be completed as part of the final design contract between ADOT and Entranco for the Gilbert Road to Higley Road segment of RMF.

Cite this Record

Data Recovery Plan for AZ U:10:123 (ASM) Within the Proposed Red Mountain Freeway Corridor, Mesa, Maricopa County, Arizona, 048. Mary-Ellen Walsh, Michael Stubing, Laurene Montero. 2000 ( tDAR id: 425573) ; doi:10.6067/XCV8425573

This Resource is Part of the Following Collections

Spatial Coverage

min long: -111.877; min lat: 33.405 ; max long: -111.694; max lat: 33.485 ;

Individual & Institutional Roles

Contact(s): Salt River Project Cultural Resource Manager

Contributor(s): Montero Laurene

Repository(s): Salt River Project, Tempe, AZ

Prepared By(s): ENTRANCO Environmental Services Group

Submitted To(s): Arizona Department of Transportation, Environmental Planning Group

Record Identifiers

Salt River Project Library Call No.(s): HE206.2.R43W35 2000

TRACS No.(s): 202L MA 017 H5299 01C

Project Report(s): 2000-048

Salt River Project Barcode No.(s): 00091020

File Information

  Name Size Creation Date Date Uploaded Access
2000_WalshStubingMontero_DataRecovery_OCR_PDFA.pdf 21.27mb Dec 1, 2000 Sep 19, 2016 10:32:23 AM Confidential
This file is unredacted.

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Salt River Project Cultural Resource Manager