A Cultural Resource Survey for the Proposed Pinnacle Peak Substation Project, Maricopa County, Arizona

Author(s): Dawn Muecke; Kris Dobschuetz

Year: 2008

Summary

Arizona Public Service Company (APS) retained Environmental Planning Group (EPG) to conduct a cultural resource study of their proposed Pinnacle Peak Substation  project. These studies are intended to assist APS in compliance with the City of Phoenix Zoning Ordinance, Chapter 8, Section 802.

Cite this Record

A Cultural Resource Survey for the Proposed Pinnacle Peak Substation Project, Maricopa County, Arizona, 31. Dawn Muecke, Kris Dobschuetz. 2008 ( tDAR id: 426295) ; doi:10.6067/XCV8426295

This Resource is Part of the Following Collections

Spatial Coverage

min long: -111.966; min lat: 33.688 ; max long: -111.921; max lat: 33.714 ;

Individual & Institutional Roles

Contact(s): Salt River Project Cultural Resource Manager

Principal Investigator(s): Kris Dobscheutz

Repository(s): Salt River Project, Tempe, AZ

Prepared By(s): Environmental Planning Group

Submitted To(s): City of Phoenix Archaeology Office; Arizona Public Service Company

Record Identifiers

EPG Cultural Resource Services Technical Paper No.(s): 2008-31

Pueblo Grande Museum Project No.(s): 2008-68

File Information

  Name Size Creation Date Date Uploaded Access
2008_MueckeDobschuetz_ACulturalPeak_OCR_PDFA.pdf 11.27mb Sep 1, 2008 Feb 1, 2017 12:45:42 PM Confidential
This file is unredacted.

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Salt River Project Cultural Resource Manager