Results of Archaeological Monitoring for the Salt River Project 4-kV to 12-kV Power Supply Upgrade Project, Within a Portion of AZ U:10:127(ASM)/The Will E. Coyote Site, Phoenix-Mesa Gateway Airport, Maricopa County, Arizona

Author(s): Mary-Ellen Walsh; David Q. Bustoz

Year: 2013

Summary

Phoenix-Mesa Gateway Airport (PMGA), administered by PMGAA, is upgrading and modernizing its runways and taxiways with new pavement and shoulders, drainage, and installation of utility conduits for lighting along the taxiway. SRP is upgrading the power supply from 4 kV to 12 kV as part of the project. At the request of SRP, Logan Simpson Design Inc. (LSD) conducted archaeological monitoring within the boundary of AZ U:10:127(ASM), the Will E. Coyote site, a prehistoric Hohokam site listed in the National Register of Historic Places. A Programmatic Agreement (PA) is in effect for ground-disturbing activities conducted at PMGA.

Cite this Record

Results of Archaeological Monitoring for the Salt River Project 4-kV to 12-kV Power Supply Upgrade Project, Within a Portion of AZ U:10:127(ASM)/The Will E. Coyote Site, Phoenix-Mesa Gateway Airport, Maricopa County, Arizona. Mary-Ellen Walsh, David Q. Bustoz. 2013 ( tDAR id: 427122) ; doi:10.6067/XCV8427122

This Resource is Part of the Following Collections

Spatial Coverage

min long: -111.686; min lat: 33.292 ; max long: -111.635; max lat: 33.321 ;

Record Identifiers

ASM Accession No.(s): 2012-598

LSD Technical Report No.(s): 125416b

ASM Permit No.(s): 2012-127ps

File Information

  Name Size Creation Date Date Uploaded Access
2013_WalshBustoz_ResultsOfCoyote_OCR_PDFA.pdf 5.73mb May 1, 2013 Jan 25, 2017 12:09:59 PM Confidential
This file is unredacted.

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Salt River Project Cultural Resource Manager