Phase II Existing Conditions Assessment of Building 5907, Camp Bullis, Texas

Year: 2010

Summary

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Delivery Order 013, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). The Phase I and Phase II ECA reports have been prepared to conform to the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan (ICRMP) for historic buildings and Army Regulations for building reduction.

The objectives of this Phase II ECA Report are to supplement the Phase I ECA and document additional assessment activities in support of the facility reduction program. To complete this objective, this report will in general analyze and evaluate alternatives for Building 5907 based on new development plans at Camp Bullis.

Cite this Record

Phase II Existing Conditions Assessment of Building 5907, Camp Bullis, Texas. 2010 ( tDAR id: 436427) ; doi:10.48512/XCV8436427

Spatial Coverage

min long: -98.664; min lat: 29.625 ; max long: -98.47; max lat: 29.776 ;

Individual & Institutional Roles

Contact(s): Cultural Resource Office, Joint Base San Antonio

Repository(s): Fort Sam Houston

Prepared By(s): CH2M HILL

Submitted To(s): US Army Corps of Engineers, Fort Worth District

Record Identifiers

Delivery Order(s): 013

Contract Number(s): W9126G-06-D-0400

File Information

  Name Size Creation Date Date Uploaded Access
2010-CB-B5907-Existing-Condition-PhII.pdf 1.07mb Jun 19, 2017 8:41:58 AM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Cultural Resource Office, Joint Base San Antonio