Monitor of Building 250 Fence Construction

Part of the F.E. Warren AFB Project Metadata project

Author(s): Rick Bryant

Year: 2002

Summary

In August 2002, workers excavating holes for the fence posts surrounding building 250 uncovered the remains of poured concrete foundations about 18" below the present surface, running in an east-west direction. Remains were found in three places. In all cases, the 36-inch drill just nicked the edge of the foundation, resulting in little damage. Since the foundations are on the very edge of the holes, there was no need to dig further. The foundations were left in place. After the fence posts are built, the holes will be backfilled. The base Historic Preservation Officer determined that the remains were not significant, and the project was allowed to proceed.

Cite this Record

Monitor of Building 250 Fence Construction. Rick Bryant. 2002 ( tDAR id: 470820) ; doi:10.48512/XCV8470820

Spatial Coverage

min long: -104.898; min lat: 41.129 ; max long: -104.83; max lat: 41.211 ;

Individual & Institutional Roles

Contact(s): F.E. Warren Air Force Base CRM Manager

File Information

  Name Size Creation Date Date Uploaded Access
2020820--Monitor-of-Bldg-250-Fence-Construction.pdf 386.40kb Oct 5, 2022 12:48:55 PM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): F.E. Warren Air Force Base CRM Manager