SRP is working with the City of Chandler and Intel on the High-Tech Interconnect Project (HIP), a proposed transmission project that is required to provide reliable power to the expansion of Intel’s Chandler campus.  SRP is working with the City of Chandler to meet the city’s preference to underground a significant portion of the transmission line, address conflicts with existing underground utilities, and ensure technical feasibility of the underground segments. The remaining overhead segments are located within areas that already have overhead transmission facilities or are commercial in nature. The underground portion of the route that was approved between SRP and the City of Chandler designates the city to pay for the incremental cost for undergrounding. The Intel expansion will require SRP to build a new 230kV substation on Intel’s campus and new 230kV transmission lines connecting the campus to two existing substations.  

As a part of SRP’s Certificate of Environmental Compatibility, a Class I records search and a Class III cultural resources survey of the project area were conducted. The Class I records search was conducted by PanGIS, Inc. (PanGIS) and is reported elsewhere (Mengers 2021). Following the Class I records search, SRP tasked EcoPlan to conduct an intensive pedestrian (Class III) cultural resources survey (reported herein). The purpose of the survey was to identify cultural resources within the project area, assess their eligibility for listing according to the National Register of Historic Places (NRHP) criteria for significance, 36 Code of Federal Regulations 60.4, and make a recommendation concerning the potential effect of the proposed undertaking on cultural resources listed in or eligible for listing in the NRHP.

Cite this Record

Cultural Resources Survey for the SRP High-Tech Interconnect Project, Chandler, Maricopa County, Arizona. Andrew D. Lack. 2022 ( tDAR id: 475417) ; doi:10.48512/XCV8475417

This Resource is Part of the Following Collections

Individual & Institutional Roles

Contact(s): Daniel Garcia

Prepared By(s): EcoPlan Associates, Inc.

Submitted To(s): Salt River Project

Record Identifiers

Report No.(s): 21-753001

File Information

  Name Size Creation Date Date Uploaded Access
Lack-2022-CRSurvey-for-the-SRP-High-Tech-Interconnect-Project.pdf 2.79mb Apr 27, 2023 4:20:27 PM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Daniel Garcia