The Grand Canalscape Phase II (TIGER) Shared-use Path project is a City of Phoenix (City) pathway improvement project that will complete a shared-use path along the Grand Canal from Interstate 17 (I-17) in Phoenix to the City of Tempe border at 56th Street (Figure 1, Figure 2). The pathway improvements will occur along three discontiguous segments of the Grand Canal (designated as Segments 1, 2, and 3). Phase I of the Grand Canalscape, which is in the final design stage, will provide the connection between the three segments.

Numerous cultural resources have been identified throughout the Phase II area of potential effects (APE); these may be adversely affected during project construction. As a result, a Memorandum of Agreement (MOA) has been executed between the Federal Highway Administration (FHWA), the State Historic Preservation Office (SHPO), and numerous other invited signatories and consulting parties (March 6, 2017).

Preconstruction geotechnical investigations were required to assist in the development of design plans. The geotechnical activities were located within the boundaries and 250-foot buffers of two Hohokam habitation sites-AZ U:9:1(ASM)/Pueblo Grande and AZ U:9:67(ASM)/La Lomita-as a result, cultural resources monitoring of geotechnical boring locations was required. As defined by the City, the area within 250 feet of the boundary of an archaeological site is considered to be the site's "buffer" and must be considered in terms of potential ground-disturbing activities.

Cite this Record

Archaeological Monitoring of Geotechnical Investigations for the Grand Canalscape Phase II (TIGER) Shared-use Path Project in Phoenix, Maricopa County, Arizona. Korri Turner, Glennda Gene Luhnow. 2017 ( tDAR id: 476357) ; doi:10.48512/XCV8476357

This Resource is Part of the Following Collections

Keywords

Individual & Institutional Roles

Contact(s): Daniel Garcia

Record Identifiers

Project Report No.(s): 2017-003

File Information

  Name Size Creation Date Date Uploaded Access
Turner-2017-Arch-Monit-Geotechnical-Investigations-Grand-Canal... 25.13mb Jul 18, 2023 7:34:04 AM Confidential

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Daniel Garcia