Addendum Cultural Resources Monitoring and Discovery Plan for the Grand Canalscape Phase II (TIGER) Shared-use Path Project Construction, Phoenix, Maricopa County, Arizona
Author(s): Glennda Gene Luhnow; Nancy Shelton
Year: 2018
Summary
The Grand Canalscape Phase II (TIGER) Shared-use Path project is a City of Phoenix (City) pathway improvement project that would complete a shareduse path along the Grand Canal from Interstate 17 (1-17) in Phoenix to the City of Tempe border at 56th Street. The pathway improvements would occur along three discontiguous segments of the Grand Canal (designated as segments 1, 2, and 3). Phase I of the Grand Canalscape, which is under construction, would provide the connection between the three segments. Cultural resources monitoring would be conducted for Phase I of the Grand Canalscape project under the provisions of a separate addendum monitoring and discovery plan (Luhnow 2017) approved under consultation conducted under Section 106 of the National Historic Preservation Act (NHPA) of 1966, as amended (Cogswell [SHPO] to Heath [Reclamation], August 8, 2017).
Cite this Record
Addendum Cultural Resources Monitoring and Discovery Plan for the Grand Canalscape Phase II (TIGER) Shared-use Path Project Construction, Phoenix, Maricopa County, Arizona. Glennda Gene Luhnow, Nancy Shelton. 2018 ( tDAR id: 476363) ; doi:10.48512/XCV8476363
Keywords
Site Name
AZ 9:27(ASM)
•
AZ T:12:250(ASM)
•
AZ T:12:256(ASM)
•
AZ T:12:36(ASM)
•
AZ T:12:49(ASM)
•
AZ T:7:167(ASM)
•
AZ U:9:1(ASM)
•
AZ U:9:2(ASM)
•
AZ U:9:67(ASM)
•
Casa Buena
•
EI Caserio
•
El Higo
•
Grand Canal
•
Grand Canal Ruin
•
Hohokam-Pima Irrigation Sites
•
Joint Head Canal and Dam
•
La Lomita
•
Leo's Site
•
P:3:8(GP)
•
Pueblo Grande
•
T-2/Turney 2
•
Turney-3
Investigation Types
Ground Disturbance Monitoring
•
Research Design / Data Recovery Plan
Geographic Keywords
Maricopa (County)
•
Phoenix
Individual & Institutional Roles
Contact(s): Daniel Garcia
Record Identifiers
Project Report No.(s): 2017-012
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
Luhnow-2018-Addendum-CRMonitoring-Discovery-Plan-Grand-Canalsc... | 28.93mb | Jul 18, 2023 11:01:38 AM | Confidential |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below
Contact(s): Daniel Garcia