Monitoring Plan for the Construction Phase of the San Xavier Farm Rehabilitation Project, San Xavier District, Tohono O’odham Nation

Summary

This project is part of the San Xavier Farm Rehabilitation Project. Additional entries related to this project can be found at the following link: https://core.tdar.org/collection/27482

The Bureau of Reclamation (Reclamation) is assisting the San Xavier District (District) of the Tohono O’odham Nation and the San Xavier Farm Cooperative in the extensive rehabilitation of approximately 1,700 acres of active and fallow farmland along the Santa Cruz River at San Xavier. The major impacts to fields and some adjacent lands will be from installation of water pipelines, laterals, and vaults; reconstruction of drainage channels; and construction of dikes to prevent storm water runoff, including an extension of the Arizona Department of Transportation (ADOT) dike under Interstate 19 (I-19) at the Papago Interchange. The project is covered by a Memorandum of Agreement between Reclamation, San Xavier District, Bureau of Indian Affairs, and State Historic Preservation Office, including a burial agreement plan. Archaeological Consulting Services, Ltd. (ACS) recently completed intensive testing within the proposed rights-of-way of the various project components (January–March, 2005) (report at tDAR ID: 393788), leading to the identification of three archaeologically sensitive areas. This construction monitoring plan utilizes the fieldwork data for establishing monitoring protocols and procedures to be followed during the construction phase.

The major elements of this monitoring plan were to identify the responsibilities of each party, establish contacts and protocol for notification and consultation communication, and to clearly identify consequences of noncompliance to construction schedule and in terms of liability to the Contractor. Contractor Specifications prepared by Reclamation clearly discussed the various monitoring conditions described in this plan.

Cite this Record

Monitoring Plan for the Construction Phase of the San Xavier Farm Rehabilitation Project, San Xavier District, Tohono O’odham Nation. ( tDAR id: 393798) ; doi:10.6067/XCV8PG1T4B

This Resource is Part of the Following Collections

Keywords

Spatial Coverage

min long: -111.031; min lat: 32.068 ; max long: -110.986; max lat: 32.138 ;

Record Identifiers

Bureau of Reclamation Delivery Order No.(s): 04F0320110

ACS Project No.(s): 03-116-06A

Bureau of Reclamation Contract No.(s): 01-CS-32-0110

Resources Inside this Project (Viewing 1-3 of 3)

There are 3 Documents within this Project [remove this filter]

Documents

  1. Monitoring of the Construction Phase of the San Xavier Farm Rehabilitation Project, San Xavier District, Tohono O’odham Nation: Photo Log (2006)
  2. Monitoring Plan for the Construction Phase of the San Xavier Farm Rehabilitation Project, San Xavier District, Tohono O’odham Nation: Executive Summary (2005)
  3. Monitoring Plan for the Construction Phase of the San Xavier Farm Rehabilitation Project, San Xavier District, Tohono O’odham Nation: Report (2005)