Siphon Draw (Geographic Keyword)
1-8 (8 Records)
Northland Research, Inc. (Northland) has completed a Class III archaeological survey of portions of the Coronado to Goldfield 230kV transmission line located on Arizona State lands, USDI Bureau of Land Management (BLM) lands and Salt River Project (SRP) right-of-ways across privately held lands. Reconnaissance of state and private (patented) lands was completed on April 24 and 25 of 1991 under Permit Number 90-39, and BLM lands were surveyed on May 3, Under Permit Number AZ-000065. As a result...
A Cultural Inventory of the Proposed Granite Reef and Salt-Gila Aqueducts, Agua Fria River to Gila River, Arizona (1969)
The Central Arizona Project (CAP) was authorized by the Colorado River Basin Act (P.L. 90-537) in 1968. The following year, the Department of Anthropology at Arizona State University conducted a survey of the preliminary alignment of the Granite Reef Aqueduct and portions of the Salt-Gila Aqueduct for the Bureau of Reclamation under a National Park Service contract. The feasibility alignment extended from the Agua Fria River, southeast to the Gila River and was divided into eight sections: four...
A Cultural Inventory of the Proposed Granite Reef and Salt-Gila Aqueducts, Agua Fria River to Gila River, Arizona (1969)
One of several construction programs proposed for inclusion in the Central Arizona Project was a system of aqueducts to link Parker Dam on the Colorado River in western Arizona and the Charleston Damsite on the San Pedro River in southeastern Arizona. Since the possibility existed that archaeological remains might be destroyed by necessary subjugation of lands for the aqueduct, the Southwest Archaeological Center of the National Park Service, U. S. Department of the Interior, made arrangements...
A Cultural Resource Survey of the Salt River Project 47E-1.35S and 45E-1.5S Proposed Substation Sites, Pinal County, Arizona (1996)
Northland Research, Inc. was contracted by Salt River Project to perform a Class III records search and cultural resources survey for two proposed substation sites. The survey was conducted on two separate parcels (Areas 1 and 2) located south of Siphon Draw, on state trust lands administered by the Arizona State Land Department. In addition to the parcels to be purchased, Northland examined a 50 ft. buffer zone on all four sides of each parcel (Areas 1B and 2B, respectively). Area 1 and 1B...
Cultural Resources Survey of the Salt River Project Mesa Highlands and 46E 1S Substations, Maricopa and Pinal Counties, Arizona (1991)
A cultural resources survey of two proposed substations was conducted for Salt River Project by archaeologists from SWCA, Inc. Environmental Consultants, on January 30, 1991. The project involved the survey of approximately 3.5 acres of State of Arizona Lands for the Mesa Highlands substation located in Maricopa County west of Apache Junction, Arizona, and approximately 4.0 acres of State of Arizona Lands for the 46E 1S substation located in Pinal County south of Apache Junction on the Queen...
Hohokam Archaeology along the Salt-Gila Aqueduct Central Arizona Project, Volume IV: Prehistoric Occupation of the Queen Creek Delta (1984)
This is the fourth volume in a nine-volume series that reports archaeological investigations along the Salt-Gila Aqueduct in southcentral Arizona. The aqueduct, under construction by the U.S. Bureau of Reclamation, is a 58-mile-long component of the Central Arizona Project; it begins east of Phoenix and extends to the vicinity of the Picacho Mountains. This volume reports excavations conducted at the three largest sites located north of the Gila River in the Aqueduct study area. All will be...
Mitigation Plan for the Salt-Gila Aqueduct (1979)
In 1978, the Bureau of Reclamation (Reclamation) directed the Museum of Northern Arizona (MNA) to complete an intensive archaeological survey of the proposed alignment for the Salt-Gila Aqueduct, a feature of the Central Arizona Project. The survey area was 11,115 acres and included the 60 mile-long transmission line (with a typical width of 200 meters), three proposed utility line locations, one flood retention dike location, 11 possible spoil or realignment areas, and a subsidence well....
Salt-Gila Aqueduct (Fannin-McFarland Aqueduct) Archaeological Data Collection Studies and Supplemental Class III Survey Project
This project presents a series of publications associated with the Salt-Gila Aqueduct Archaeological Data Collection Studies and Supplemental Class III Survey Project (SGA). The research focused on data recovery at those sites potentially subject to impact as a consequence of Central Arizona Project construction. Salt-Gila Aqueduct Central Arizona Project construction occured along a route extending 97 km from a point south of Apache Junction, Arizona, to the Picacho Reservoir. Significant...