Intersection Improvement (Other Keyword)
1-9 (9 Records)
"The Department proposes to improve the S. C. 302/4 intersection by moving the alignment of S. C. 302 approximately 200 meters to the southeast resulting in a crossroads intersection of S. C. 302 and S-53 with S. C. 4. This will improve safety and slight distance for the intersection."
Cultural Resources Survey of proposed improvements at U.S. 25 and Walnut Lane (2009)
"The purpose of the proposed project is to improve the operating conditions at the intersection of Walnut Lane at U.S. 25, including the entrance to the "Sweetwater" development, located in Aiken County, SC (Figures I and 2). The existing Walnut LanelU.S. 25 intersection is a stop controlled, three-way, T-type intersection. U.S. 25 in the vicinity of Walnut Lane is a five-lane roadway with a center tum lane. Approaching U.S. 25, Walnut Lane is a two-lane roadway."
Cultural Resources Survey of the S-45 and S-901 Intersection Improvements Project, Aiken County, South Carolina (2010)
"The project is for proposed improvements to the S-45 and S-901 intersection in North Augusta, South Carolina. The S-45 and S-901 Intersection Improvements Project includes the realignment of S-901 into S-45, the installation of left and right tum lanes on S-45, the clearing of vegetation, and the removal of existing pavement. These improvements, proposed by the Department Traffic Safety Office, are designed to reduce the numbers of rearend crashes and to improve traffic flow at the...
Cultural Resources Survey of the SC-118 and S-895 Intersection Improvements Project, Aiken County, South Carolina (2010)
"The project is for proposed improvements to the SC-118 and S-895 intersection in Aiken, South Carolina. The SC-118 and S-895 Intersection Improvements Project includes the installation of left tum lanes on all approaches. These include new rights-of-way (ROW) extending approximately 500 feet north, south, east, and west of the intersection. These improvements, proposed by the Department Traffic Safety Office, are designed to reduce the numbers of rear-end crashes and to improve traffic flow at...
Intensive Archaeological and Historical Architectural Survey for an Intersection Improvements Project, Aiken County (2001)
"The Department proposes to construct a turn lane along SC19 at S-600 and realign S-1303 to align S-600 in order to improve this intersection safety."
Intensive Archaeological Survey of Intersection Improvements, Aiken County (2000)
"The Department proposes to improve the.....intersection by eliminating the "Y" intersection and creating a "T" intersection. This will be accomplished by moving the intersection....approximately 500 feet to the east."
Intersection Improvements at SC 191 and Canal Street in the Town of Graniteville, Aiken County, South Carolina (2006)
"The purpose of the project is to eliminate two dangerous railroad crossings by constructing a new location roadway at SC 191 and Canal Street and a new safer crossing. In addition to the intersection improvement at SC 191 and Canal Street (see sheet number 9), a new curb will be placed in the two areas where the existing crossings will be eliminated (see sheet number 8). New 2' curb and gutters will be placed at several other crossings (see sheet numbers 7-8). New railroad signalization and...
Phase I Cultural Resources Survey of 1.47 miles on SC 125 in North Augusta, Aiken County, South Carolina (2012)
"An approximately 1.47 mile long by 120 foot wide corridor on SC 125 (E. Buena Vista and Atomic Rd) in North Augusta. Proposed improvements include the addition of a center tum land, improved turning radii, a planted median and sections of new curb and sidewalk. The survey corridor includes commercial and residential areas as well as a government complex and public recreational facilities. Substantial drainage improvements are located along E. Buena Vista where an unnamed drainage parallels the...
S.C. Route 19/302/Road S-419 Intersection Improvements Project, Aiken County (2005)
"The only area of new right of way required for this project is a small sight triangle and a narrow sliver measuring approximately 10 feet at its widest point and tapering back to the existing 30-foot right of way over a distance of about 450 feet. This area of new right of way includes three driveways and a landscaped lawn and parking area for the South Aiken Baptist Church. This parking area is flat and is partially covered with grass. The project is located in a commercial area of the town of...