The Bureau of Reclamation (Reclamation), United States Department of the Interior, was in the initial stages of the Water Management Project designed to bring Central Arizona Project water to the Gila River Indian Community (GRIC). Under terms of a contract signed in 1992 with the GRIC, facilities designed and constructed by Reclamation would deliver 173,000 acre-feet of water annually onto the reservation. Federal law mandates consideration of potential impacts of such projects upon cultural...
An Archaeological Survey of a Proposed Landfill, Salt River Pima-Maricopa Indian Community, Maricopa County, Arizona (1993)
Archaeological Consulting Services, Ltd. (ACS) conducted a cultural resources survey on the Salt River Pima-Maricopa Indian Community for a proposed landfill site. The survey, requested by Terry Leonard of the SRPMIC, was undertaken to identify and assess cultural resources that might be impacted by the development of the landfill. Twenty-three sites were identified, 18 prehistoric and five historic. Nine of the prehistoric sites represent lithic scatters, four are artifact scatters, and five...
The Beeline Archaeological Project (1990)
The Salt River Project (SRP) and Arizona Public Service Company (APS) constructed three transmission lines along a portion of the Beeline Highway on the Salt River Pima-Maricopa Indian Community (SRPMIC). SRP proposed to build a new line that connects the Pinnacle Peak, Brandow, and Papago Buttes substations. At the same time, APS proposed to realign two existing transmission lines and move them out of the Salt River channel and onto the north terrace above the river. Prior to construction,...