This report presents the results of a resource inventory conducted at F.E. Warren Air Force Base (AFB), Cheyenne, Wyoming. The inventory was performed under Contract F04704-83-C-0008 between URS-Berger and the Department of the Air Force (AFRCE-BMS). The purpose of this inventory was to locate archaeological and paleontological resources that may be affected by proposed Peacekeeper facilities siting at F.E. Warren AFB and to provide data for the preparation of Draft Environmental Impact...
A Cultural Resource Inventory of the F.E. Warren Air Force Base 75.27-Acre Land Transfer to Cheyenne Regional Medical Center, Laramie County, Wyoming (2013)
Cultural Resource Analysts, Inc., was contracted by AMEC Environmental and Infrastructure, Inc., to conduct a cultural resource inventory of a proposed land transfer between F. E. Warren Air Force Base and Cheyenne Regional Medical Center in Laramie County, Wyoming. File and record searches were conducted at F.E. Warren Air Force Base and with the Wyoming Cultural Records Office. The inventory included a Class Ill block inventory of 75.27 acres located on F. E. Warren Air Force Base between Old...
Cultural Resources Monitoring, Site Inspections, Study Area 9, Cheyenne Depot/Camp Carlin, F.E. Warren Air Force Base, Cheyenne, Wyoming (2003)
A Supplemental Preliminary Assessment/Site Inspection (PA/SI) was conducted at F.E. Warren Air Force Base (AFB), Cheyenne, Wyoming. The purpose of this project was to identify potentially contaminated sites that may require additional investigation and/or remediation under the Air Force Installation Restoration Program (IRP). The Preliminary Assessment/Site Inspection (PA/SI) included sampling and analysis of soil and groundwater to assess the potential for contamination. Ten areas of concern...
F.E. Warren AFB Project Metadata
Metadata for the F.E. Warren AFB collection.
Final Environmental Planning Technical Report Cultural and Paleontological Resources (1984)
The President has directed that the Air Force deploy the Peacekeeper Missile System at a location near F.E. Warren Air Force Base (hereafter F.E. Warren AFB), close to Cheyenne, Wyoming. The Peacekeeper System (formerly known as the M-X System) is an advanced, land-based intercontinental ballistic missile. The plan calls for the replacement of 100 existing Minuteman III missiles with 100 Peacekeeper missiles. Existing missile silos will be used, and there will be very little structural...
Mitigation Plan for Cultural Resources Affected by Peacekeeper Rail Garrison Construction, F.E. Warren Air Force Base, Cheyenne, Wyoming (1990)
In 1986, President Reagan announced his decision to begin development of the Rail Garrison basing mode for the deployment of Peacekeeper missiles. In this basing mode, Peacekeeper missiles would be deployed on trains garrisoned at specified Air Force installations. F.E. Warren Air Force Base (AFB) near Cheyenne, Wyoming, was designated by the President as the Main Operating Base and the first garrison installation. Construction of Peacekeeper Rail Garrison facilities at F. E. Warren AFB is...
Peacekeeper Program Component Effect Report #3 Launch Facility Trainer (1986)
This report covers the Launch Facility {LF) Trainer Component of the Peacekeeper Program. As currently sited, this facility will be constructed within the boundaries of the F.E. Warren Air Force Base Historic District/National Landmark as well as within the site boundaries of Cheyenne Depot {48-LA-106), which has been determined eligible for listing in the National Register of Historic Places {NRHP). Based on the results of archeological and architectural onsite survey, the Air Force, in...
Survey of Proposed Drainage Basin I Adjacent to Camp Carlin - 48LA106 (2005)
F. E. Warren AFB proposes to construct several detention ponds and channels as part of a base-wide storm water run-off project. Pond I of this project is located just outside the east Camp Carlin boundary, in the Fort D. A. Russell National Historic Landmark (48-LA- 71). The pond will be excavated by mechanical earthmoving equipment and a berm will be constructed along the south and west sides of the pond. A drainage channel will connect the pond to Crow Creek to the south. The purpose of the...