AZ U:13:254 (ASM) (Site Name Keyword)
1-6 (6 Records)
Between October 20 and 23, 2004, archaeologists from EnviroSystems Management, Inc. (EnviroSystems) conducted a Class III cultural resources inventory of 1,568 acres of private land between Coolidge and Florence, Pinal County, Arizona. The 1,568 acres are part of a 3,260-acre parcel proposed for residential development (the remaining 1,692 acres were not examined during this project because 442 acres of the parcel were under cotton cultivation at the time of the inventory and the other 1,250...
A Class I Cultural Resources Inventory for the Pinal West to Southeast Valley/Browning 500 kV Project, Pinal and Maricopa Counties, Arizona (2004)
Greystone Environmental Consultants, Inc., on behalf of Salt River Project Agricultural Improvement and Power District (SRP), has developed this Class I Cultural Resources Inventory for the Pinal West to Southeast Valley/Browning 500 kV Project (Project) as part of the Certificate of Environmental Compatibility (CEC) Application. SRP contracted with Greystone Environmental Consultants, Inc. (Greystone) to complete the Class I report. The Project includes the construction of one single circuit...
A Class I Cultural Resources Inventory of the North-South Corridor Study, Pinal County, Arizona (2011)
Under contract with the Arizona Department of Transportation (ADOT), HDR Engineering, Inc. (HDR), has been tasked with the preliminary planning and predesign of a north-south highway corridor in Pinal County, Arizona (Federal Highway Administration Project No. STP-999-A [BBM]; TRACS No. 999 PN H7454 O1L). This highway will link Interstate 10 (I-10), in the vicinity of Picacho, to U.S. Highway 60 (also known as the Superstition Freeway), in the vicinity of Apache Junction. HDR has subcontracted...
A Cultural Resources Assessment of Potential Routes for the Salt River Project's Proposed 230 kV Electric Transmission Line in District 4 of the Gila River Indian Community, Maricopa and Pinal Counties, Arizona (2013)
This report presents the results of a Cultural Resources Assessment (Class I Records Search, with limited supplemental fieldwork) by the Gila River Indian Community (GRIC) Cultural Resource Management Program (CRMP) for the proposed construction of a 230 kV electric transmission line in District 4 of the GRIC, Maricopa and Pinal Counties, Arizona (CRMP Project No. 2012.36x0). Implementation of the proposed undertaking will require approval from the Bureau of Indian Affairs (BIA), Pima Agency....
A Cultural Resources Survey of Approximately 1,346 Acres of Private Land Within the Proposed Merrill Ranch Development Near Florence, Pinal County, Arizona (2004)
Carter & Burgess, Inc. (C&B) conducted a Class III, non collection cultural resources survey of approximately 1,346 acres of privately owned land within the proposed Merrill Ranch development, located northwest of Florence, Pinal County, Arizona (Figure 1). The survey was conducted at the request of Vanguard Properties as part of ongoing efforts to determine whether significant cultural resources exist within the Merrill Ranch development, prior to the proposed construction of...
Cultural Resources Survey of SRP Electric Line Right-of-way, North Side of Johnson Ranch Boulevard at Hunt Highway, Pinal County, Arizona (2006)
Class III cultural resources survey of planned right-of-way easement for installation of an underground 12 kV electric line to serve as a tie-in between Johnson Ranch and the Webber Substation.