AZ U:15:86(ASM) (Site Name Keyword)
1-7 (7 Records)
As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. To assist with project planning, Reclamation directed Archaeological Consulting Services, Ltd. (ACS)...
Class I (Overview) Survey Update of the San Carlos Irrigation Drainage District (SCIDD) Joint Works for the U.S. Bureau of Reclamation, Pinal County, Arizona: Photo (2009)
As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. To assist with project planning, Reclamation directed Archaeological Consulting Services, Ltd. (ACS)...
Class I (Overview) Survey Update of the San Carlos Irrigation Drainage District (SCIDD) Joint Works for the U.S. Bureau of Reclamation, Pinal County, Arizona: Report (2009)
As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. To assist with project planning, Reclamation directed Archaeological Consulting Services, Ltd. (ACS)...
A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation
The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...
A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation: Report (1995)
The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...
Hohokam Archaeology along the Salt-Gila Aqueduct Central Arizona Project, Volume I: Research Design (1982)
This volume is the first in a series of publications associated with the Salt-Gila Aqueduct Archaeological Data Collection Studies and Supplemental Class 3 Survey Project (SGA). The project focuses principally upon data recovery at those sites potentially subject to impact as a consequence of Central Arizona Project construction along a route extending 97 km from a point south of Apache Junction, Arizona, to the Picacho Reservoir. This initial volume incorporates the results of test excavations...
Salt-Gila Aqueduct (Fannin-McFarland Aqueduct) Archaeological Data Collection Studies and Supplemental Class III Survey Project
This project presents a series of publications associated with the Salt-Gila Aqueduct Archaeological Data Collection Studies and Supplemental Class III Survey Project (SGA). The research focused on data recovery at those sites potentially subject to impact as a consequence of Central Arizona Project construction. Salt-Gila Aqueduct Central Arizona Project construction occured along a route extending 97 km from a point south of Apache Junction, Arizona, to the Picacho Reservoir. Significant...