The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...
A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation: Report (1995)
The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...
Cultural Resources Assessment of 28 Archaeological Sites Located Along Reach 4 of the Fannin-McFarland Portion of the CAP Canal
The Bureau of Reclamation has developed an archaeological site database for the Central Arizona Project (CAP) canal main stem based on the Class III survey data that includes all previously recorded sites. An unknown number of these sites were either destroyed by construction or excavation, while others are no longer located within the CAP right-of-way (ROW). To assist Reclamation in checking the accuracy of its site database, Archaeological Consulting Services, Ltd. (ACS) was asked to revisit...
Cultural Resources Assessment of 28 Archaeological Sites Located Along Reach 4 of the Fannin-McFarland Portion of the CAP Canal (2009)
The Bureau of Reclamation has developed an archaeological site database for the Central Arizona Project (CAP) canal main stem based on the Class III survey data that includes all previously recorded sites. An unknown number of these sites were either destroyed by construction or excavation, while others are no longer located within the CAP right-of-way (ROW). To assist Reclamation in checking the accuracy of its site database, Archaeological Consulting Services, Ltd. (ACS) was asked to revisit...
Hohokam Archaeology along the Salt-Gila Aqueduct Central Arizona Project, Volume I: Research Design (1982)
This volume is the first in a series of publications associated with the Salt-Gila Aqueduct Archaeological Data Collection Studies and Supplemental Class 3 Survey Project (SGA). The project focuses principally upon data recovery at those sites potentially subject to impact as a consequence of Central Arizona Project construction along a route extending 97 km from a point south of Apache Junction, Arizona, to the Picacho Reservoir. This initial volume incorporates the results of test excavations...
Photolog for Photos from the Cultural Resources Assessment of 28 Archaeological Sites Located Along Reach 4 of the Fannin-McFarland Portion of the CAP Canal (2009)
The Bureau of Reclamation has developed an archaeological site database for the Central Arizona Project (CAP) canal main stem based on the Class III survey data that includes all previously recorded sites. An unknown number of these sites were either destroyed by construction or excavation, while others are no longer located within the CAP right-of-way (ROW). To assist Reclamation in checking the accuracy of its site database, Archaeological Consulting Services, Ltd. (ACS) was asked to revisit...
Photos from the Cultural Resources Assessment of 28 Archaeological Sites Located Along Reach 4 of the Fannin-McFarland Portion of the CAP Canal (2009)
The Bureau of Reclamation has developed an archaeological site database for the Central Arizona Project (CAP) canal main stem based on the Class III survey data that includes all previously recorded sites. An unknown number of these sites were either destroyed by construction or excavation, while others are no longer located within the CAP right-of-way (ROW). To assist Reclamation in checking the accuracy of its site database, Archaeological Consulting Services, Ltd. (ACS) was asked to revisit...
Salt-Gila Aqueduct (Fannin-McFarland Aqueduct) Archaeological Data Collection Studies and Supplemental Class III Survey Project
This project presents a series of publications associated with the Salt-Gila Aqueduct Archaeological Data Collection Studies and Supplemental Class III Survey Project (SGA). The research focused on data recovery at those sites potentially subject to impact as a consequence of Central Arizona Project construction. Salt-Gila Aqueduct Central Arizona Project construction occured along a route extending 97 km from a point south of Apache Junction, Arizona, to the Picacho Reservoir. Significant...