US Army Corps of Engineers, St. Louis District VCP
Part of: US Army Corps of Engineers, St. Louis District , Veterans Curation Program
Site Name Keywords
Lock and Dam 24
Other Keywords
Collections Management •
Finding Aid
Investigation Types
Heritage Management •
Architectural Documentation
Geographic Keywords
United States of America (Country) •
Missouri (State / Territory) •
Illinois (State / Territory) •
Pike County (County) •
North America (Continent) •
Clarksville •
Mississipi River •
USA (Country)
Resources Inside This Collection (Viewing 1-28 of 28)
-
Finding Aid, Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013 (2014)
DOCUMENT Full-Text
This collection is referred to as "Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013.” This name is consistent throughout the finding aid, the file folders, and the box labels. The extent of this collection is one (1) linear inch. There is no final report associated with the document collection, as it does not belong to a typical archaeological investigation. In total there were 25 black and white photographs in good condition, despite some yellowing, residue stains, and...
-
Photographic Materials Spreadsheet, Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013 (2014)
DATASET
This is the photographic material spreadsheet for the Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013 collection.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013
PROJECT
This collection is referred to as "Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013.” This name is consistent throughout the finding aid, the file folders, and the box labels. The extent of this collection is one (1) linear inch. There is no final report associated with the document collection, as it does not belong to a typical archaeological investigation. In total there were 25 black and white photographs in good condition, despite some yellowing, residue stains, and...
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0001 (1936)
IMAGE
Photograph of the Lock Site from the Illinois shore of the Upper Mississippi River, Lock Number 24 during the Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013 archaeological investigation in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0002 (1936)
IMAGE
Photograph of the Cofferdam construction showing Cross Diaphrams and Driving Template of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0003 (1936)
IMAGE
Photograph of the view of Cofferdam from top of Bluff of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0004 (1936)
IMAGE
Photograph of the view of upper end of Cofferdam from top of bluff of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0005 (1936)
IMAGE
Photograph of the pump at upper riverside cofferdam of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0006 (1936)
IMAGE
Photograph of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0007 (1937)
IMAGE
Photograph of Cofferdam, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0008 (1937)
IMAGE
Photograph of the Upper Mississippi River, Lock Number 24, view of downstream in Cofferdam during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0009 (1937)
IMAGE
Photograph of the upper guide wall for the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0010 (1937)
IMAGE
Photograph of the upstream end of Cofferdam of Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0011 (1937)
IMAGE
Photograph of the general view of Cofferdam from a bluff on the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0012 (1937)
IMAGE
Photograph of the failure of the steel cut off wall of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0013 (1937)
IMAGE
Photograph of the a downstream view of the Thru Main Lock of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0014 (1937)
IMAGE
Photograph of the upstream view showing construction of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0015 (1937)
IMAGE
Photograph of the upstream nose of interior wall of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0016 (1937)
IMAGE
Photograph of the form on upstream nose "B" pour intermediate wall of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0017 (1937)
IMAGE
Photograph of a view of downstream through the main lock of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0018 (1937)
IMAGE
Photograph of a view of downstream through the main lock of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0019 (1937)
IMAGE
Photograph of a general view from the bluff of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0020 (1937)
IMAGE
Photograph of a crane placing top girder on upstream gate of the main lock of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0021 (1937)
IMAGE
Photograph of the operating machinery of the Miter Gate of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0022 (1937)
IMAGE
Photograph of the main lock of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0023 (1937)
IMAGE
Photograph of the general view of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0024 (1937)
IMAGE
Photograph of the view of lock from bluff of the Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri.
-
Saint Louis District Lock and Dam 24 Photographs 1936-1938 and 1936-2013, Archival Photograph 1002-0025 (1938)
IMAGE
Photograph of the office and inspection force for Upper Mississippi River, Lock Number 24 during the construction of the lock on the Mississippi River in Pike County, Missouri. Back Row: Clete Barnett, Carl A. Banshack, Henry F. Rothwell, Thomas Kennedy, John G. Crockett, Harold C. Hall, and Martin G. Tieman Jr. Middle Row: Percy L. Jones, Ray P. O’Brien, William P. Zey, Charles M. Moxom, James E. Thomas, and Ed Spoeler. Front Row: Everett O. Ewalt, Selee (possibly the dog), William L....