Bird-Houston Site

Part of: Route 301

Resource Inside This Collection (Viewing 1-1 of 1)

There is 1 Project within this Collection [remove this filter]


  • Bird-Houston Site (7NC-F-138), U.S. Route 301 Corridor
    PROJECT John Bedell. FHWA.

    The Louis Berger Group, Inc., conducted Phase II and III archaeological investigations at the Bird-Houston Site (7NC-F-138), located in St. Georges Hundred, New Castle County, Delaware, in advance of the proposed U.S. Route 301 construction. The Bird-Houston Site is the remains of a small farm occupied between about 1775 and 1920. The site has two distinct parts about 200 feet apart; Locus B was occupied from about 1775 to 1825, and Locus A was occupied from about 1825 to 1920. Documentary...