Archaeological Monitoring of a Sewer Line Across the Western Canal at the Priest Road Bridge Widening, Tempe, Arizona

Author(s): Josephine Merewether

Year: 1988

Summary

In October 1988, construction began on the Priest Road bridge at the Western Canal. The City of Tempe is widening the bridge and thet Salt River project (SRP), in conjunction with this construction, is putting a new 21-in. sewer line and a water line across the canal west of Priest Road. At the request of Judy Brunson, SRP archaeologist, Soil Systems, Inc. (SSI) monitored the excavation of the backhoe trench for the sewer line across the canal.

Cite this Record

Archaeological Monitoring of a Sewer Line Across the Western Canal at the Priest Road Bridge Widening, Tempe, Arizona, 25. Josephine Merewether. Soil Systems Technical Reports ,88. Phoenix, AZ: Soil Systems, Inc. 1988 ( tDAR id: 402704) ; doi:10.6067/XCV8402704

This Resource is Part of the Following Collections

Spatial Coverage

min long: -111.976; min lat: 33.375 ; max long: -111.95; max lat: 33.398 ;

Individual & Institutional Roles

Contact(s): Salt River Project Cultural Resource Manager

Contributor(s): Judy Brunson

Principal Investigator(s): Cory Dale Breternitz

Sponsor(s): Salt River Project

Prepared By(s): Soil Systems, Inc.

Submitted To(s): Salt River Project

File Information

  Name Size Creation Date Date Uploaded Access
1988_Merewether_ArchaeologicalMonitoring.pdf 234.42kb Nov 1, 1988 May 6, 2016 10:56:59 AM Confidential
This file is unredacted.

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Salt River Project Cultural Resource Manager