Archaeological Assessment of Three Power Pole Locations Along the Coolidge-Hayden 115kV Powerline East of Florence, Pinal County, Arizona

Author(s): C. Scott Crownover

Year: 1994

Summary

Archaeological Consulting Services, Ltd. (ACS) was requested by Dr. Judy Brunson-Hadley of the Salt River Project (SRP) to perform a cultural resource survey for three power pole locations along the existing Coolidge-Hayden 115kV transmission line. A new pole will be erected to connect the proposed Arizona Public Service Company (APS) Bonney Brook Substation near Florence, Pinal County; two other poles along the 115kV transmission line will be replaced. ACS recently completed archaeological testing and data recovery for a related project at AZ U:15:46(ASM), Locus S (Crownover and Troncone 1994), which would be impacted by construction of the substation where two of the SRP poles would be placed. AZ U:15:46(ASM) was determined eligible for inclusion in the National Register of Historic Places during data recovery for the Salt-Gila Aqueduct\Central Arizona Project (Teague and Crown 1983). SRP requested the current survey to insure that the proposed power pole installations would not impact recently identified features of AZ U:15:46(ASM), Locus S.

AZ U:15:46 (ASM) is a previously known site, but not investigated during this project. No features or artifacts associated with AZ U:15:46(ASM) were found within the restricted area of the proposed project. Proposed project does not appear to impact archaeological resources at AZ U:15:46(ASM).

Cite this Record

Archaeological Assessment of Three Power Pole Locations Along the Coolidge-Hayden 115kV Powerline East of Florence, Pinal County, Arizona. C. Scott Crownover. 1994 ( tDAR id: 433648) ; doi:10.6067/XCV8433648

This Resource is Part of the Following Collections

Spatial Coverage

min long: -111.42; min lat: 33.03 ; max long: -111.373; max lat: 33.057 ;

Individual & Institutional Roles

Contact(s): Salt River Project Cultural Resource Manager

Contributor(s): John Rapp

Field Director(s): C. Scott Crownover

Project Director(s): Barbara S. Macnider

Collaborator(s): Arizona Public Service Company

Repository(s): Salt River Project, Tempe, AZ

Prepared By(s): Archaeological Consulting Services, Ltd.

Submitted To(s): Salt River Project, Tempe, AZ

Record Identifiers

ASLD Right-of-Way No. (s): 16-4302

ACS Project No.(s): 94-11

ASM Permit No.(s): 94-40

File Information

  Name Size Creation Date Date Uploaded Access
1994_Crownover_ArchaeologicalAssessmentPowerPole_OCR_PDFA.pdf 2.93mb Mar 2, 1994 May 8, 2017 2:44:14 PM Confidential
This file is unredacted.

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): Salt River Project Cultural Resource Manager