Archaeological Monitoring Report: Subsurface Removal, New Boston Air Force Station, New Hampshire (Draft)
Author(s): United States Army Corps of Engineers, Omaha; URS Group, Inc.
Year: 2016
Summary
URS Group, Inc. (URS) was contracted by the United States (U.S.) Army Corps of Engineers (USACE) Omaha District, under Contract Number (No.) W9128F-10-D-0061 Delivery Order 0006, to complete a subsurface removal action in multiple areas at New Boston Air Force Station (NBAFS), New Hampshire to remove munitions and explosives of concern (MEC).
The purpose of the overall project was to complete a subsurface removal to the depth of detection throughout NBAFS including 16 operations and recreational areas, two ponds, and along 26 designated roadways. NBAFS identified these high use areas of the installation for additional subsurface removal in order to reduce human exposure to potential subsurface MEC. The subsurface removal was completed in accordance with follow-on recommendations presented in the Final New Boston Air Force Station Action Memorandum for Former Active Range Area, to address residual subsurface hazards that remained at the MRSs following previous surface clearance activities (Shaw 2010a).
URS has prepared a separate Site Specific Final Report (SSFR) that describes the results of the 2013 and 2015 subsurface removal activities at NBAFS. Removal activities were completed to address multiple removal areas within seven munitions response sites (MRSs) at NBAFS: Joe English Pond (AW701), Target Buffer Area (MU702, MU702A, MU702B), Target Buffer Range Overshot Area (MU703A), Shooting Fields Overshot Area (MU703B), and Shooting Fields (MU705). The work was completed under the U.S. Air Force (USAF) Military Munitions Response Program (MMRP).
Cite this Record
Archaeological Monitoring Report: Subsurface Removal, New Boston Air Force Station, New Hampshire (Draft). United States Army Corps of Engineers, Omaha, URS Group, Inc.. 2016 ( tDAR id: 438083) ; doi:10.6067/XCV8438083
This Resource is Part of the Following Collections
Keywords
Culture
Historic
Material
Building Materials
•
Ceramic
•
Farm Equipment
•
Glass
•
Metal
•
Wood
Site Type
Agricultural or Herding
•
Archaeological Feature
•
Artifact Scatter
•
Farmstead
•
Road
Investigation Types
Archaeological Overview
•
Consultation
•
Ground Disturbance Monitoring
•
Research Design / Data Recovery Plan
General
Archaeological Monitoring Report
•
Subsurface Removal
Geographic Keywords
Hillsborough (County)
•
New Boston, NH
•
New Boston Air Force Station
•
New Hampshire (State / Territory)
Temporal Keywords
Historic
Temporal Coverage
Calendar Date: 1941 to 1992 (Military Occupation (WWII and Cold War))
Calendar Date: 1750 to 1940 (Rural Historics)
Spatial Coverage
min long: -71.736; min lat: 42.896 ; max long: -71.526; max lat: 43.009 ;
Individual & Institutional Roles
Contact(s): New Boston Air Force Station
Contributor(s): Clark Moses; Deborah Marcaurelle
Principal Investigator(s): Daniel Cassedy
Prepared By(s): United States Army Corps of Engineers, Omaha; URS Group, Inc.
Submitted To(s): Air Force Space Command
Record Identifiers
Delivery Order(s): 0006
Contract No.(s): W9128-10-D-0061
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
USACE-Omaha_Archeo-Monitoring-Subsurface-Removal-NBAFS_2016_OC... | 1,555.13mb | Oct 1, 2016 | Sep 14, 2017 8:58:01 AM | Confidential | |
This file is unredacted. |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below
Contact(s): New Boston Air Force Station