End-of-Fieldwork Report for Phase I Data Testing and Phase II Data Recovery at AZ U:9:165(ASM) and AZ U:9:298(ASM) for the City of Tempe’s 8th Street Multi-use Path and Streetscape Improvements (Rural Road to McClintock Drive) Project Tempe, Maricopa County, Arizona
Author(s): Jacqueline R. Fox; Travis Cureton; Mark R. Hackbarth
Year: 2020
Summary
The COT, in conjunction with the ADOT and FHWA, is planning to construct a multi-use path (MUP) and implement streetscape improvements along 8th Street between Rural Road and McClintock Drive in Tempe. The APE consists of one mile of the existing 8th Street right-of-way measuring 73.0 ft to 90.5 ft wide. This includes the COT-owned property on the north side of 8th Street from Rural Road to Dorsey Lane (a former railroad ROW measuring 33 feet wide by 2,640 feet long), and a SRVWUA 1911 north-south oriented easement midway between Rural Road and Dorsey Lane.
The 8th Street MUP APE was previously surveyed and found to include two archaeological sites (AZ U:9:165[ASM] and AZ U:9:298[ASM]) and two in-use historic structures (US Route 80/Bankhead Highway/Old 8th Street and Tempe-Hayden Canal System) (AMEC 2018). Additionally, three previously mapped alignments of prehistoric Canal System 1 are projected to intersect the APE. Preparation of a historic property treatment plan (HPTP; Ferland 2018) and implementation of Phase I data testing was recommended to assess the presence and preservation of the following cultural resources and any associated human remains within the APE.
Cite this Record
End-of-Fieldwork Report for Phase I Data Testing and Phase II Data Recovery at AZ U:9:165(ASM) and AZ U:9:298(ASM) for the City of Tempe’s 8th Street Multi-use Path and Streetscape Improvements (Rural Road to McClintock Drive) Project Tempe, Maricopa County, Arizona. Jacqueline R. Fox, Travis Cureton, Mark R. Hackbarth. 2020 ( tDAR id: 475277) ; doi:10.48512/XCV8475277
Keywords
Material
Ceramic
•
Chipped Stone
•
Dating Sample
•
Glass
•
Ground Stone
•
Human Remains
•
Metal
•
Pollen
Site Name
AZ U:9:165(ASM)
•
AZ U:9:298(ASM)
•
La Plaza
•
M&P&SRV RR
•
Maricopa and Phoenix and Salt River Valley Railroad
•
Old 8th Street
•
Tempe-Hayden Canal System
•
US 80/Bankhead Highway
•
US Route 80
Site Type
Ancient Structure
•
Artifact Scatter
•
Burial Pit
•
Canal or Canal Feature
•
Historic Structure
•
Railroad
•
Roasting Pit / Oven / Horno
•
Water Control Feature
Investigation Types
Data Recovery / Excavation
Geographic Keywords
Maricopa (County)
•
Tempe
Individual & Institutional Roles
Contact(s): Daniel Garcia
Prepared By(s): Logan Simpson, Inc.
Submitted To(s): City of Tempe
Record Identifiers
City of Tempe Project No.(s): 6007131B
Logan Simpson Technical Report No.(s): 195291c
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
Fox-2020-Phase-I-and-II-for-COT-8th-St-Multi-use-Path-and-Stre... | 17.09mb | Apr 14, 2023 8:27:01 AM | Confidential |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below
Contact(s): Daniel Garcia