Results of Cultural Resources Monitoring for Grand Canalscape Phase II (TIGER) Shared-use Pathway Project Construction, Phoenix, Maricopa County, Arizona
Author(s): Oslynn Benjamin; Glennda Gene Luhnow
Year: 2020
Summary
The Grand Canalscape Phase II (TIGER) Shared-use Pathway project is a City of Phoenix (City) pathway improvement project that completes a shared-use path along the Grand Canal from North 23rd Avenue south of West Indian School Road in Phoenix to the City of Tempe border at 56th Street. Pathway improvements were constructed along three discontinuous segments of the Grand Canal:
• Segment 1: Grand Canal alignment between I-17 and 15th Avenue;
• Segment 2: Grand Canal alignment between 16th Street and 36th Street;
• Segment 3: Grand Canal alignment between 40th Street and 56th Street.
The pathway improvements were constructed along the banks of the Grand Canal and within and adjacent to City streets. The project’s area of potential effects (APE) crossed the boundaries and/or 250-foot buffers of six archaeological sites as well as the plotted locations and 50-foot buffers of unverified Hohokam canal alignments. As defined by the City, the area within 250 feet of the boundary of an archaeological site or within 50 feet of an unverified Hohokam canal alignment is a “buffer” that must be considered in terms of potential ground-disturbing activities.
Cultural resources monitoring at the six sites and the plotted locations of the unverified Hohokam canal alignments was required during project construction in Segments 2 and 3pursuant to the stipulations of a project-specific Memorandum of Agreement (MOA). The cultural resources construction monitoring was conducted by Jacobs Engineering Group Inc. (Jacobs) working under the provisions outlined in the City’s blanket Monitoring and Discovery Plan for the City of Phoenix (Montero and Stubing 2004) and a project-specific monitoring and discovery plan addendum (Luhnow and Shelton 2017). This report details the results of the cultural resources monitoring.
Cite this Record
Results of Cultural Resources Monitoring for Grand Canalscape Phase II (TIGER) Shared-use Pathway Project Construction, Phoenix, Maricopa County, Arizona. Oslynn Benjamin, Glennda Gene Luhnow. 2020 ( tDAR id: 475422) ; doi:10.48512/XCV8475422
Keywords
Material
Ceramic
•
Chipped Stone
•
Fauna
•
Glass
•
Ground Stone
•
Metal
Site Name
AZ T:12:256(ASM)
•
AZ U:9:1(ASM)
•
AZ U:9:2(ASM)
•
AZ U:9:67(ASM)
•
Grand Canal Ruin
•
La Lomita
•
Leo’s Site
•
P:3:8(GP)
•
Pueblo Grande
•
Turney-3
Site Type
Canal or Canal Feature
Investigation Types
Ground Disturbance Monitoring
General
Prehistoric Irrigation Agriculture
•
Regional Trade and Interaction
Geographic Keywords
Maricopa (County)
•
Phoenix
Individual & Institutional Roles
Contact(s): Daniel Garcia
Prepared By(s): Jacobs
Submitted To(s): City of Phoenix Street Transportation Department
Record Identifiers
PGM Project No.(s): 2015-026.PGM
Federal Highway Administration Project No.(s): PHX-0(BFG)F
City of Phoenix Project No.(s): ST87600114
Project Report No.(s): 2019-014
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
Benjamin-2020-CRMonitoring-for-Grand-Canalscape-Phase-II--TIGE... | 19.20mb | Apr 28, 2023 1:13:24 PM | Confidential |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below
Contact(s): Daniel Garcia