Table Of Concordance For Sufficiency Checklist Archaeological And Historical Report Review
Part of the Eglin AFB Phase III of 8OK386 project
Author(s): Prentice Thomas & Associates, Inc.
Year: 2023
Summary
The table of concordance for the Phase III Data Recovery of a Portion of 8OK386 project. This table provides a detailed overview of various subjects and information and its location in the associated report.
Cite this Record
Table Of Concordance For Sufficiency Checklist Archaeological And Historical Report Review. Prentice Thomas & Associates, Inc.. 2023 ( tDAR id: 521261) ; doi:10.48512/XCV8521261
Keywords
Culture
Archaic
•
Early Archaic
•
Early Woodland
•
Historic
•
Late Woodland
•
post-1950s
Material
Ceramic
•
Chipped Stone
•
Fauna
•
Wood
Site Name
08OK386
Site Type
Archaeological Feature
•
Domestic Structure or Architectural Complex
Investigation Types
Data Recovery / Excavation
General
Early Archaic
•
Early-Late Woodland
•
Gin Hole Landing
•
Phase III
•
Wacissa Beveled Point
•
Weeden Island
•
Woodland
•
Yellow River
Geographic Keywords
Eglin AFB
•
Florida
•
Okaloosa (County)
•
Yellow River
Temporal Keywords
Early, Late Woodland
•
Historic Period
Individual & Institutional Roles
Contact(s): Prentice Thomas and Associates; Argonne National Laboratory
Record Identifiers
Report of Investigations(s): 1572
File Information
| Name | Size | Creation Date | Date Uploaded | Access | |
|---|---|---|---|---|---|
| 8OK386-Table-of-Concordance.pdf | 31.89kb | Jul 23, 2026 7:46:01 AM | Public |