A Proposal to Safely Recover the H.L. Hunley Submarine Located in Charleston, South Carolina (Legacy 00-106)
Summary
This proposal discusses the drawbacks of the then-proposed method of lifting the H.L. Hunley from its resting place through a system of straps and outlines a procedure for a mechanical device to scoop up the submarine and its supporting surrounding sediment. The proposal includes a timetable for construction, testing, demonstration, and actual recovery of the Hunley.
Cite this Record
A Proposal to Safely Recover the H.L. Hunley Submarine Located in Charleston, South Carolina (Legacy 00-106). ( tDAR id: 463229) ; doi:10.48512/XCV8463229
This Resource is Part of the Following Collections
URL: https://www.denix.osd.mil/cr/archives/archaeology/index.html
Keywords
Culture
Historic
Material
Metal
Site Type
Archaeological Feature
Investigation Types
Data Recovery / Excavation
•
Heritage Management
•
Methodology, Theory, or Synthesis
General
Civil War
•
Data Recovery Plan
•
Diving
•
Engineering
•
H.L. Hunley
•
submarine
•
Underwater Archeology
Geographic Keywords
Charleston, South Carolina
Temporal Keywords
Civil War
Spatial Coverage
min long: -80.138; min lat: 32.605 ; max long: -79.376; max lat: 32.986 ;
Individual & Institutional Roles
Contact(s): OSD Cultural Resources Program
Prepared By(s): Oceaneering International, Inc.
Submitted To(s): The Hunley Commission
Resources Inside this Project (Viewing 1-2 of 2)
- Documents (2)
Documents
-
H.L. Hunley General Recovery Procedures - Plan (Legacy 00-106) (2000)
DOCUMENT Full-Text
This document describes a detailed plan of the recovery procedure for the H.L. Hunley.
-
A Proposal to Safely Recover the H.L. Hunley Submarine Located in Charleston, South Carolina - Report (Legacy 00-106) (1999)
DOCUMENT Full-Text
This proposal discusses the drawbacks of the then-proposed method of lifting the H.L. Hunley from its resting place through a system of straps and outlines a procedure for a mechanical device to scoop up the submarine and its supporting surrounding sediment. The proposal includes a timetable for construction, testing, demonstration, and actual recovery of the Hunley.