Boulder City (Geographic Keyword)

1-14 (14 Records)

Archaeological Survey of the Mead to Phoenix 500kV Direct Current Transmission Line, Preferred Alternative, Volume I, Final Report (1986)
DOCUMENT Full-Text Donald R. Keller.

The 243-mile preferred alignment of the proposed Mead to Phoenix ±500kV direct current transmission system was surveyed for archaeological resources by the Museum of Northern Arizona in the spring of 1984. Fifty-eight archaeological sites were identified on the alignment, plus 10 historic routes in areas crossed by the alignment. Seventeen of the sites are historic, dating from the 1860s to World War II. Forty-one prehistoric sites range in age from the late Archaic through the Ceramic period to...


Boulder City Pit (1981)
DOCUMENT Citation Only R. M. Leavitt.

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded. If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.


Cultural Resource Analysis of the Changes to the Proposed Mead-Phoenix Transmission Project (1990)
DOCUMENT Full-Text A.E. Rogge. Patrick M. O'Brien.

The Western Area Power Administration (Western), Salt River Project (SRP), Southern California Public Power Authority (SCPPA), and M-S-R Public Power Agency (Modesto- Santa Clara-Redding) (collectively referred to as the project sponsors) propose to construct a 500 kilovolt (kV) alternating current (AC) transmission line with the capability to be upgraded later to 500kV direct current (DC). This transmission line will connect the Westwing ...


A Cultural Resource Inventory of a 14 Mile Long Powerline Right-of-Way in the Eldorado Valley, Clark County, Nevada (1991)
DOCUMENT Full-Text Kevin Rafferty.

On June 14-16, 1991 Archaeological research of Southern Nevada (ARSN) conducted a cultural resource inventory on BLM lands in the Eldorado Valley, Clark County, Nevada (Map 1) . The purpose of the survey was to inventory a right-of-way for Mead-Phoenix 500 kV corridor proposed by Salt River Project of Phoenix, Arizona. The line is on the west side of already existing power lines that dissect the Eldorado Valley. The project area is approximately 14 miles long and is contained within a 200 foot...


A Cultural Resource Investigation of the Proposed Boulder City Airport Clark County, Nevada (1984)
DOCUMENT Citation Only Kevin Rafferty.

This resource is a citation record only, the Center for Digital Antiquity does not have a copy of this document. The information in this record has been migrated into tDAR from the National Archaeological Database Reports Module (NADB-R) and updated. Most NADB-R records consist of a document citation and other metadata but do not have the documents themselves uploaded. If you have a digital copy of the document and would like to have it curated in tDAR, please contact us at comments@tdar.org.


Lower Colorado Region, Historic Building Reconnaisance Survey (1997)
DOCUMENT Full-Text Christine Pfaff.

The purpose of this study was to verify and correct the information in Reclamation’s Resource Information System (RIS, previously called LAPS) data base on Reclamation-owned buildings in the Lower Colorado Region that are more than forty years old. An additional aim of the study was to identify through research and fieldwork other forty-plus year old buildings that are Reclamation-owned that have never been entered in the data base. The survey covered buildings only; structures are listed...


The Mead to Phoenix 500kV Transmission Line Project, The Tower 29 Site: Re-Evaluation of Site 26CK3216, Clark County, Nevada (1996)
DOCUMENT Full-Text David E. Purcell.

Salt River Project has constructed a 500kV transmission line from Boulder City, Nevada, to near Phoenix, Arizona; Site 26CK3216 was first recorded by the Museum of Northern Arizona (MNA) during archaeological survey of the Mead to Phoenix right-of-way (Keller 1986). The site was originally recommended for data recovery but was determined ineligible for the National Register of Historic Places (NRHP), and construction proceeded without additional investigation. Biologists monitoring the Mead to...


The Mead To Phoenix 500kV Transmission Line Project: An Archaeological Survey of Expanded Right-of-Way for Cable Pulling at Eight Point-of-Turn Towers (1995)
DOCUMENT Full-Text David E. Purcell.

SWCA, Inc., Environmental Consultants (SWCA), conducted a comprehensive Class III archaeological survey of expanded right-of-way at eight point-of-turn towers as part of ongoing cultural resources compliance for the Mead to Phoenix 500kV Transmission line project (Figure 1). These activities constituted only one phase of cultural resource compliance for this project undertaken by SWCA for Salt River Project (SRP). Other phases relevant to this project include relocation and re-evaluation (Anduze...


The Mead to Phoenix 500kV Transmission Line Project: An Archaeological Survey of Expanded Right-of-Way for Cable Pulling at Eleven Point-of-Turn Towers (1995)
DOCUMENT Full-Text Gregory R. Seymour. David E. Purcell.

SWCA, Inc., Environmental Consultants, (SWCA) conducted a comprehensive archaeological survey of expanded rights-of-way required for cable-pulling at seven of eleven point-of-turn towers in Clark County, Nevada, as part of ongoing cultural resources compliance for the Mead to Phoenix 500kV Transmission line project. At the recommendation of the U.S. Department of Interior (USDI) Bureau of Land Management (BLM), Stateline Resource Area, Las Vegas District, no additional survey was undertaken at...


The Mead to Phoenix 500kV Transmission Line Project: An Archaeological Survey of Expanded Right-of-Way for Cable Pulling at Ten Point-of-Turn Towers (1995)
DOCUMENT Full-Text Preston C. Payton. David E. Purcell.

SWCA, Inc., Environmental Consultants (SWCA), conducted a comprehensive Class III archaeological survey of expanded right-of-way at ten point-of-turn towers as part of ongoing cultural resources compliance for the Mead to Phoenix 500kV Transmission line project. These activities constituted only one phase of cultural resource compliance for this project undertaken by SWCA for Salt River Project (SRP). Other phases relevant to this project include relocation and re-evaluation (Anduze and Sorrel...


The Mead to Phoenix 500kV Transmission Line Project: Cultural Resource Site Relocation and Evaluation (1995)
DOCUMENT Full-Text Richard Anduze. Danny Sorrell.

Salt River Project is constructing a 500kV transmission line along a 250-mile right-of-way from the Marketplace Substation to the Mead Substation, both near Boulder City, Nevada, to the Westwing Substation northwest of Phoenix, Arizona, near Sun City. The right-of-way is adjacent to and parallels the existing Mead to Liberty 345kV Transmission Line for most of the project area. A 200-foot right-of-way was previously surveyed by the Museum of Northern Arizona (Keller 1986). The present project...


The Mead to Phoenix 500kV Transmission Line Project: The Results of Construction Monitoring at Archaeological Sites in Clark County, Nevada, and Mohave, Yavapai, and Maricopa Counties, Arizona (1996)
DOCUMENT Full-Text David E. Purcell.

Salt River Project constructed a 500kV transmission line from Boulder City, Nevada, to near Phoenix, Arizona, during which SWCA, Inc., Environmental Consultants, monitored construction at 20 previously recorded archaeological sites. Monitoring took the form of damage assessments at six sites and one non-site location, active monitoring of construction at 15 sites, inspections of site conditions and reflagging at two sites, and examination of possible human remains and monitoring at one location...


Mead-Phoenix 500kV DC Transmission Line Project, Volume 1: Objectives, Procedures and Results (1983)
DOCUMENT Full-Text Wirth Environmental Services.

Western Area Power Administration (Western), Salt River Project (SRP), Southern California Public Power Authority (SCPPA) and M-S-R Public Power Agency (Modesto-Santa Clara-Redding) propose to construct, operate and maintain a ±500kV direct current (DC) transmission line from the Phoenix area in Arizona to the Mead Substation near Boulder City, Nevada (see Figure 2-1). The proposal includes a ±500kV DC transmission line, two terminal facilities, associated communication facilities, and ground...


Mead-Phoenix 500kV DC Transmission Line Project: Volume 3: Human Environment (1983)
DOCUMENT Full-Text William A. Vaughan.

The land use study was conducted by Wirth Associates as a portion of the environmental studies for the proposed Western Area Power Administration (Western), Southern California Public Power Authority (SCPPA) and the Salt River Project (SRP) Mead to Phoenix Area ±500kV DC Transmission Line Project. This report is composed of inventory and impact assessment sections for the alternative 500kV transmission corridors between the Mead Substation and the Westwing Substation in addition to the proposed...