JBSA-Sam Houston (Geographic Keyword)
251-275 (726 Records)
This letter and the two attached reports concern observations made by Geo-Marine, Inc., and its Historic Architect and Structural Engineers, of Building 4192 at Fort Sam Houston, Texas. Geo-Marine, Inc. (GMI), and its consultants, Mr. Joe Freeman (Historic Architect) and Jaster-Quintanilla (Structural Engineers), were asked to evaluate the structural and architectural conditions of Buildings 135, 4191, 4192, and 4193 at Fort Sam Houston, as well as their integrity and potential for reuse in an...
Letter from Victoria Clow to Michael Pumphrey, Building 4193, Fort Sam Houston, Texas (2005)
This letter and its two attached reports concern observations made in June of 2005 at Building 4193, Fort Sam Houston, Texas. Geo-Marine, Inc. (GMI), and its consultants, Mr. Joe Freeman (Historic Architect) and Jaster-Quintanilla (Structural Engineers), were asked to evaluate the structural and architectural conditions of the building, its integrity, and its potential for reuse in an administrative or similar function. This evaluation includes consideration of building code requirements, floor...
Letter from Victoria Clow to Michael Pumphrey, Building 610, Fort Sam Houston, Texas (2005)
This document contains two reports by Geo-Marine, Inc. (GMI), and its consultants, Mr. Joe Freeman (Historic Architect) and Jaster-Quintanilla (Structural Engineers).The two attached reports concern observations made in May of 2005 at Building 610, Fort Sam Houston, Texas. Geo-Marine, Inc. (GMI), and its consultants, Mr. Joe Freeman (Historic Architect) and Jaster-Quintanilla (Structural Engineers), were asked to evaluate the structural and architectural conditions of the building, its...
Letter from Victoria Clow to Michael Pumphrey, Building 610A, Fort Sam Houston, Texas (2005)
This letter and its attached reports concern observations made in May of 2005 at Building 610A, Fort Sam Houston, Texas. Geo-Marine, Inc. (GMI), and its consultants, Mr. Joe Freeman (Historic Architect) and Jaster-Quintanilla (Structural Engineers), were asked to evaluate the structural and architectural conditions of the building, its integrity, and its potential for reuse in an administrative or similar function. This evaluation includes consideration of building code requirements, floor load...
Letter from Victoria Clow to Michael Pumphrey, Building 611, Fort Sam Houston, Texas (2005)
This letter and its two attached reports concern observations made in May of 2005 at Building 611, Fort Sam Houston, Texas. Geo-Marine, Inc. (GMI), and its consultants, Mr. Joe Freeman (Historic Architect) and Jaster-Quintanilla (Structural Engineers), were asked to evaluate the structural and architectural conditions of the building, its integrity, and its potential for reuse in an administrative or similar function. This evaluation includes consideration of building code requirements, floor...
Letter from Victoria Clow to Michael Pumphrey, Building 611A, Fort Sam Houston, Texas (2005)
This letter and its two attached reports concern observations made in May of 2005 at the above-noted building. Geo-Marine, Inc., and its consultants, were asked to evaluate the structural and architectural conditions of the building, its integrity, and its potential for reuse in an administrative or similar function. This evaluation includes consideration of building code requirements, floor load requirements, accessibility, and the property’s historic status. Building 611A is one of a series...
Letter from Victoria Clow to Michael Pumphrey, Building 612A, Fort Sam Houston, Texas (2005)
This letter and its attached reports concern observations made in May of 2005 at Building 612A, Fort Sam Houston, Texas. Geo-Marine, Inc. (GMI), and its consultants, were asked to evaluate the structural and architectural conditions of the building, its integrity, and its potential for reuse in an administrative or similar function. This evaluation includes consideration of building code requirements, floor load requirements, accessibility, and the property’s historic status. Building 612A is...
Letter from W. C. Allanach to Laverne Herrington, Project to Remove Remainder of Freight Elevator, Building 2001, Fort Sam Houston, Texas (1981)
Correspondence regarding the removal of the mechanical gears, pulleys, brace arms and remaining appurtenances formerly utilized for the operation of the exterior freight elevator in Building 2001 in the National Historic Landmark District at Fort Sam Houston, Texas. Accompanying the letter are black and white photographs of the elevator.
Letter from Wendy L. Martinson to Mark Wolfe, Deconstruction of Building 293, Fort Sam Houston, Texas (2010)
Fort Sam Houston is proposing an undertaking to deconstruct building 293. Building 293 was constructed in 1910 as a facility to house a guard. Building 293 is listed as an eligible property within the Fort Sam Houston National Historic Landmark District and is eligible based on criteria A and C. After careful examination of this proposal, the FSH Cultural Resource Staff has determined that while the undertaking is an adverse effect, the mitigation measures will result in your concurrence that...
Letter from Wendy Martinson to Lawerence Oaks, Accident at Building 613 Needing Restoration, Fort Sam Houston, Texas (2005)
An Army vehicle moving through the sally port to the Long Barracks, Building 613, accidentally struck the upper corner of the archway, resulting in a large portion of the brick facade being undermined. The purpose of this letter is to photographic documentation and inform the Texas Historical Commission of the adverse effect this accident had on the historic building.
Letter from Wendy Martinson to Lawerence Oaks, Rehabilitation of Building 160 Artillery Post, Fort Sam Houston, Texas (2013)
Fort Sam Houston, through the Residential Communities Initiative (RCI) partnership with Lincoln Military Housing, is proposing an undertaking to rehabilitate 160 Artillery Post. While the Texas Historical Commission reviewed and concurred with the design documents for this house plan type, this letter addresses a specific problem identified in this individual house that warrants consultation under the RCI Programmatic Agreement.
Letter from Wendy Martinson to Lawerence Oaks, Retention and Installation of Porch Railings on the Infantry Post Houses, Fort Sam Houston, Texas (2006)
This letter is to reply to the letter dated November 21, 2006 from Emily Thompson Payne regarding the porch railings on the Infantry Post houses. The letter refers to the retention of non-original upstairs railings and the installation of similar railings on the first floor where none existed before.
List of Buildings, Fort Sam Houston, Texas (2000)
This document is a spreadsheet of buildings within Fort Sam Houston, Texas. The information included is the property name, number, preservation category, construction date, and their NRHP or HABS significance. The spreadsheet also includes the property type, original/current function, original recorder and date of assessment, along with additional evaluations and comments.
List of Sites, Fort Sam Houston, Texas (2002)
Spreadsheet of twelve sites located at Fort Sam Houston. Included are the site numbers, locations, field numbers, cultural terms, components, site dimensions and size, artifact density, artifact content, NRHP eligibility, recommendations, sources consulted, and survey codes.
List of Sites, Fort Sam Houston, Texas (2000)
This document is a spreadsheet providing information on sites within the area of Fort Sam Houston. Included are the sites' easting, northing, dimensions, size and temporary field number. The spreadsheet also includes the sites' artifact density and content, cultural terms, components, NRHP eligibility, recommendations and sources consulted in addition to TASA and TARL files.
List of Surveys, Fort Sam Houston, Texas (2000)
This document is a spreadsheet providing information on surveys conducted at Fort Sam Houston between 1977-1999. Included are the names and contact information of the contractors, the principal investigators and field directors, survey names and reports, reference contract numbers, delivery order numbers, and the type of survey and number of old and new sites recorded.
List of Surveys, Fort Sam Houston, Texas (2002)
A spreadsheet of surveys related to archaeological and historical assessments at Fort Sam Houston. Included are years of projects, the institutions involved, principal investigators, field directors, types of surveys, contract numbers, number of new and old sites recorded and their significance.
Memorandum for Commander, Outline for Camp Bullis Historical Monograph, Camp Bullis Training Site, Texas (1990)
An outline of the proposed monograph on the history of Camp Bullis. This memorandum requests comments and suggestions for additional topics or matters to be considered for inclusion in the study. The monograph traces the development and use of facilities at Camp Bullis and Leon Springs Military Reservation from their origins to the present.
Memorandum for Commander, Update to NAGPRA Section 6 Summary Report for Fort Sam Houston and Camp Bullis Training Site, Texas (1996)
The U.S. Army Engineer District, St. Louis, has been designated the Corps' Mandatory Center of Expertise for the Curation and Management of Archaeological Collections. We have been tasked by the U.S. Army Environmental Center to locate and assess archaeological collections derived from Army-owned lands, to identify the federally recognized Native American tribes most likely culturally affiliated with the collections, to draft Section 6 Summary letters for each installation, and to conduct...
Memorandum from David Brigham to Sandi Illing, Historical Assessment of a 0.531 Acre Parcel on Old Austin Road, Fort Sam Houston, Texas (2002)
The 0.531 acre parcel extending beyond the fence line of Fort Sam Houston on Old Austin Road has been evaluated. This document is part of a group of correspondence concerning a 0.531-acre parcel at Old Austin Road on the north-central portion of Fort Sam Houston, Texas. The documentation provided in these letters help evaluate the character of the property, before it is transferred to the City of San Antonio, in exchange for a perpetual non-exclusive use agreement to facilitate the realignment...
Memorandum from G. Kenneth Grim, Transmittal of the Final Environmental Baseline Survey for Residential Communities Initiative Properties at Fort Sam Houston, Texas (2004)
A memorandum for disbursement sent from Tetra Tech Inc. to Fort Worth District, Norfolk District, Mobile District, Fort Sam Houston, and the RCI Office. This memorandum transmits the final Environmental Baseline Survey for Residential Communities Initiative Properties at Fort Sam Houston, Texas.
Memorandum of Agreement Between Fort Sam Houston and the Texas Historical Preservation Officer, Regarding the Demolition of Properties Eligible for the National Register of Historic Places, Fort Sam Houston, Texas (2002)
Fort Sam Houston has determined that the demolition of Buildings 376, 377, and 4115 at Fort Sam Houston and Building 5102 at Camp Bullis will have an adverse effect of the Fort Sam Houston Conservation District, which is eligible for the National Register of Historic Places, and has consulted with the Texas State Historic Preservation Officer regarding implementing Section 106 of the National Historic Preservation Act.
Memorandum of Agreement Between Fort Sam Houston and the Texas State Historic Preservation Officer Regarding the Demolition of Building 1030 Eligible for the National Register of Historic Places (2000)
An unsigned agreement regarding the Department of the Army, Fort Sam Houston (FSH) and Advisory Council on Historic Preservation regarding the demolition of building 1030. Fort Sam Houston (FSH) has determined that the Demolition of Building 1030 at Fort Sam Houston (undertaking) will have an adverse effect on the FSH Conservation District, which is eligible for the National Register of Historic Places, and has consulted with the Texas State Historic Preservation Officer (SHPO) pursuant to 36...
Memorandum of Agreement Between Fort Sam Houston and the Texas State Historic Preservation Officer Regarding the Demolition of Building 1030 Eligible for the National Register of Historic Places, Signed (2002)
A partially signed agreement indicating that Fort Sam Houston has determined that the demolition of Building 1030 at Fort Sam Houston will have an adverse effect on the Fort Sam Houston Conservation District, which is eligible for the National Register of Historic Places, and has consulted with the Texas State Historic Preservation Officer pursuant to regulations implementing Section 106 of the National Historic Preservation Act.
Memorandum of Agreement Between Fort Sam Houston and the Texas State Historic Preservation Officer Regarding the Demolition of Properties Eligible for the National Register of Historic Places, Building 5002, Camp Bullis, Fort Sam Houston, Texas (2002)
This Memorandum of Agreement states that Fort Sam Houston has determined that the demolition of Building 5002 at Camp Bullis will have an adverse effect on the historic property. It documents the coordination and discussion between Fort Sam Houston and the Texas State Historic Preservation Officer, as well as the City of San Antonio regarding the effects of the undertaking. This MOA is part of a group of correspondence and a memorandum for the Section 106 project review of Fort Sam Houston's...