Heritage Management (Investigation Type)

Studies and plans related to managing or planning for the care, interpretation, preservation, or protection of archaeological resources, including collections, records, and sites.

5,826-5,850 (9,707 Records)

Phase I Archeological Survey of the Army Research Laboratory Facility at the Adelphi Laboratory Center, Adelphi, Maryland (1994)
DOCUMENT Full-Text US Army Corps of Engineers, Baltimore District.

This report presents the Executive Summary, and Chapter V, Summary and Conclusions of the Phase I archeological investigations at the Adelphi Laboratory Center (ALC) in Adelphi, Maryland. This study was designed to address the Department of Defense’s responsibilities under Section 110 of the National Historic Preservation Act of 1966, as amended, as well as Army Regulation 420-40. This documentation shall serve as a Technical Appendix to the Cultural Resources Management Plan, prepared by the...


A Phase I Assessment of Archaeological Collections from the USACE Savannah District (1997)
DOCUMENT Full-Text Charles M. Slaymaker.

Between September 1994 and January 1995, the U.S. Army Corps of Engineers, St. Louis District's Mandatory Center of Expertise for the Curation and Management of Archaeological Collections (MCX-CMAC) performed research to address the status of the Savannah District's archaeological collections from projects conducted, on fee-title land at Hartwell, Russell, and J. Strom Thurmond lakes in Georgia and South Carolina. The MCX-CMAC conducted a literature and site record review of all work conducted...


Phase I Cultural Resource Survey of the Child Development Center at the Adelphi Laboratory Center Adelphi, Maryland ADI_0096 (1994)
DOCUMENT Full-Text Uploaded by: system user

A Cultural Resources Management Plan (CRMP) was prepared for Adelphi Laboratory Center (ALC) by the Baltimore District. The information in this report is based on the 1993 CRMP and on the reports of several site-specific cultural investigations performed at ALC. The Proposed Child Development Center (Site 1) is a 2.4-acre site located north of the main (Powder Mill Road) entrance to the ALC. The site is a forested area and is bounded on the south by the main entrance, on the east by a forested...


Phase I Cultural Resources Survey and Phase II Archaeological Testing of the Proposed Bridge Replacement Along Road S-19 Over the Little River (2006)
DOCUMENT Full-Text Alex Sweeney.

"... This survey was conducted on behalf of the South Carolina Department of Transportation (SCDOT) in Columbia, South Carolina. These investigations were conducted in compliance with Section 106 of the National Historic Preservation Act (NHPA) by personnel qualified under 36 CFR Part 61, and consistent with guidelines developed by the SCDAH. The goals of this investigation were to identify archaeological sites and architectural resources (e.g., standing structures) within and immediately...


Phase I Cultural Resources Survey of 7245 Acres at Strom Thurmond Lake 2000 (2000)
DOCUMENT Full-Text Jennifer Grover. Meghan LaGraff Ambronsino. Kenny Pearce.

Panamerican Consultants, Inc. performed a Phase I cultural resources survey of approximately 2,932.1 ha (7,245 ac.) contained within selected areas of Columbia and McDuffie counties, Thurmond Lake, Georgia (Contract No. DACW21-95-D-0007, Delivery Order 42). The Operations Project Manager for Thurmond Lake, Georgia and South Carolina, requested that this survey of selected areas in Columbia and McDuffie counties, Georgia be performed. This contract effort was designed to locate and assess the...


Phase I Cultural Resources Survey of 8,450 Acres, Thurmond Lake, Lincoln County, Georgia and McCormick County, South Carolina, Volume 1, Survey of 8450 Acres of Strom Thurmond Lake 1999 (1999)
DOCUMENT Full-Text Jennifer E. Grover. Meghan LaGraff Ambrosino. Kristen M. Zschomler. Greg S. Hendryx. James N. Ambrosino.

Panamerican Consultants, Inc., performed a Phase I cultural resources survey of 3,419.7 hectares (ha) (8,450 acres [ac.]) at Thurmond Lake, Georgia and South Carolina. The Operations Project Manager for Thurmond Lake, Georgia and South Carolina, requested that this survey of selected areas in Lincoln County, Georgia, and McCormick County, South Carolina be performed. This contract effort was designed to locate and assess the significance of cultural resources within the project area by means of...


Phase I Cultural Resources Survey of 8,450 Acres, Thurmond Lake, Lincoln County, Georgia and McCormick County, South Carolina, Volume 2, Survey of 8450 Acres of Strom Thurmond Lake 1999 (1999)
DOCUMENT Full-Text Jennifer E. Grover. Meghan LaGraff Ambrosino. Kristen M. Zschomler. Greg S. Hendryx. James N. Ambrosino.

Panamerican Consultants, Inc., performed a Phase I cultural resources survey of 3,419.7 hectares (ha) (8,450 acres [ac.]) at Thurmond Lake, Georgia and South Carolina. The Operations Project Manager for Thurmond Lake, Georgia and South Carolina, requested that this survey of selected areas in Lincoln County, Georgia, and McCormick County, South Carolina be performed. This contract effort was designed to locate and assess the significance of cultural resources within the project area by means of...


Phase I Cultural Resources Survey of Tactical Training Areas 9C, 9D, 9E, 10A, & 10B, United States Army Training Center at Fort Dix, Ocean County, New Jersey (2003)
DOCUMENT Full-Text Mark Kruszczynski. Laura Barrett Silsbee.

Pacific Environmental Services, Inc. (PES), a MACTEC Company, conducted a Phase I Cultural Resources Survey of approximately 1,676 acres (678 hectares) in Tactical (TAC) Areas 9A, 9B, 9C, 10A, and 10B in the northeastern section of the United States Army Training Center (USATC) at Fort Dix, New Jersey (NJ). This project was carried out as part of the ongoing efforts of the Fort Dix Historic Preservation Office (FDHPO) program to comply with federal and local cultural resource legislation such...


Phase I Existing Conditions Assessment of Building 1026, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 1281, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard operating...


Phase I Existing Conditions Assessment of Building 189, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 197, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 198, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 199, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 2018, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 2019, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 2157, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 238, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 240, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard operating...


Phase I Existing Conditions Assessment of Building 325, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 4190, Fort Sam Houston, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 5108, Camp Bullis, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 5110, Camp Bullis, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 5122, Camp Bullis, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...


Phase I Existing Conditions Assessment of Building 5123, Camp Bullis, Texas (2009)
DOCUMENT Full-Text Uploaded by: Chelsea Walter

This Existing Conditions Assessment (ECA) project was contracted by the U.S. Army Corps of Engineers (USACE), Fort Worth District, under Contract W9126G-06-D-0400, Task Order 008, in support of Fort Sam Houston (FSH) and Camp Bullis (CB). This ECA report was prepared to support the Army Alternate Procedures (AAP) Historic Properties Component (HPC) of the Integrated Cultural Resources Management Plan for historic buildings and Army Regulations for building reduction. The HPC has standard...