Cheyenne Depot (Site Name Keyword)

1-12 (12 Records)

1988 Cultural Resources Investigations in the Vicinity of F.E. Warren Air Force Base, Wyoming: Volume I (1989)
DOCUMENT Full-Text Uploaded by: Rachel Fernandez

This report presents the results of cultural resources investigations conducted by Tetra Tech, Inc. at F.E. Warren Air Force Base (AFB}, Wyoming from May to October 1988. The work consisted of intensive archaeological survey and testing, monitoring of Explosive Ordnance Disposal (EOD) clearance, and evaluation of sites as part of impact assessment for the proposed Peacekeeper Rail Garrison program. Western Public History Associates, a Tetra Tech subcontractor, conducted archival research on...


A Cultural Resource Inventory of the F.E. Warren Air Force Base 75.27-Acre Land Transfer to Cheyenne Regional Medical Center, Laramie County, Wyoming (2013)
DOCUMENT Full-Text Tosh McKetta.

Cultural Resource Analysts, Inc., was contracted by AMEC Environmental and Infrastructure, Inc., to conduct a cultural resource inventory of a proposed land transfer between F. E. Warren Air Force Base and Cheyenne Regional Medical Center in Laramie County, Wyoming. File and record searches were conducted at F.E. Warren Air Force Base and with the Wyoming Cultural Records Office. The inventory included a Class Ill block inventory of 75.27 acres located on F. E. Warren Air Force Base between Old...


Cultural Resource Monitor Report for Landfill 4, Zone E, Remedial Investigation and Feasibility Study (RI/FS) Field Investigation, F.E. Warren Air Force Base, Laramie County, Wyoming (2001)
DOCUMENT Full-Text James M. Brechtel.

Cultural resource monitoring was conducted on Landfill 4, Zone E, Remedial Investigation and Feasibility Study (RI/FS) Field Investigation project on F.E. Warren Air Force Base (AFB) by James Brechtel on behalf of CH2M Hill. The purpose of the project was to conduct field investigations for a remedial investigation and feasibility study of Landfill 4, which is found in the southeastern portion of the base. The project consisted of an assessment of the landfill contents and the horizontal and...


Cultural Resources Monitoring, Site Inspections, Study Area 9, Cheyenne Depot/Camp Carlin, F.E. Warren Air Force Base, Cheyenne, Wyoming (2003)
DOCUMENT Full-Text Susan L. Bupp.

A Supplemental Preliminary Assessment/Site Inspection (PA/SI) was conducted at F.E. Warren Air Force Base (AFB), Cheyenne, Wyoming. The purpose of this project was to identify potentially contaminated sites that may require additional investigation and/or remediation under the Air Force Installation Restoration Program (IRP). The Preliminary Assessment/Site Inspection (PA/SI) included sampling and analysis of soil and groundwater to assess the potential for contamination. Ten areas of concern...


F.E. Warren AFB Project Metadata
PROJECT Uploaded by: Rachel Fernandez

Metadata for the F.E. Warren AFB collection.


Field Notes and Photographs for Cultural Resources Monitoring Site Inspections, Study Area 9, Cheyenne Depot/Camp Carlin, F.E. Warren Air Force Base Cheyenne, Wyoming (2003)
DOCUMENT Full-Text Kent Friesen.

Field Notes from the Cheyenne Depot Cultural Resources Monitoring Site Inspection of Study Area 9 carried out in September 2003 at F.E. Warren Air Force Base in Cheyenne, Wyoming.


Final Environmental Planning Technical Report Cultural and Paleontological Resources (1984)
DOCUMENT Full-Text Martha Bowers. Robert W. Foss. J. Sanderson Stevens. Robert Wall.

The President has directed that the Air Force deploy the Peacekeeper Missile System at a location near F.E. Warren Air Force Base (hereafter F.E. Warren AFB), close to Cheyenne, Wyoming. The Peacekeeper System (formerly known as the M-X System) is an advanced, land-based intercontinental ballistic missile. The plan calls for the replacement of 100 existing Minuteman III missiles with 100 Peacekeeper missiles. Existing missile silos will be used, and there will be very little structural...


Mitigation Plan for Cultural Resources Affected by Peacekeeper Rail Garrison Construction, F.E. Warren Air Force Base, Cheyenne, Wyoming (1990)
DOCUMENT Full-Text Susan L. Bupp. Fredrick S. Hickman. Raj Mathur. John R. Sabol.

In 1986, President Reagan announced his decision to begin development of the Rail Garrison basing mode for the deployment of Peacekeeper missiles. In this basing mode, Peacekeeper missiles would be deployed on trains garrisoned at specified Air Force installations. F.E. Warren Air Force Base (AFB) near Cheyenne, Wyoming, was designated by the President as the Main Operating Base and the first garrison installation. Construction of Peacekeeper Rail Garrison facilities at F. E. Warren AFB is...


Peacekeeper Program Component Effect Report #3 Launch Facility Trainer (1986)
DOCUMENT Full-Text Norton Air Force Base.

This report covers the Launch Facility {LF) Trainer Component of the Peacekeeper Program. As currently sited, this facility will be constructed within the boundaries of the F.E. Warren Air Force Base Historic District/National Landmark as well as within the site boundaries of Cheyenne Depot {48-LA-106), which has been determined eligible for listing in the National Register of Historic Places {NRHP). Based on the results of archeological and architectural onsite survey, the Air Force, in...


Peacekeeper Program Component Effect Report #4 Trainer and Instruction Facility (1984)
DOCUMENT Full-Text Mark Junge. Dennis Madden. Lester Ross. Robert Murray.

The proposed Trainer and Instruction Facility (TIF) Component of the Peacekeeper Program is a new building to be constructed within the F.E. Warren Historic District/National Landmark and within the historic boundaries of Cheyenne Depot, which has been determined to be eligible for listing in the National Register of Historic Places (NRHP). The Air Force, in consultation with the Wyoming State Historic Preservation Officer (SHPO), has determined that the project will have an adverse effect on...


Pre-Draft Work-in-Progress Copy of Peacekeeper Program Cultural Resources Monitoring Status Report, F.E. Warren Air Force Base, Wyoming, April-December 1985 (1985)
DOCUMENT Full-Text Jeffrey L. Yarne. Jerry V. Jermann. Raymond Rodrigue.

URS-Berger herewith submits the requested review copies of the subject Technical Report in Pre-Draft work-in-progress form. This loose-leaf review copy is not a complete report nor has it undergone final edit and quality control. There are no graphics in this copy and only parts of the Appendix. The completed Draft report is scheduled for late April 1985. This report is the third of four reports in this series, summarizing Cultural Resources inventory, evaluation, and mitigation activities...


Survey of Proposed Drainage Basin I Adjacent to Camp Carlin - 48LA106 (2005)
DOCUMENT Full-Text Uploaded by: Rachel Fernandez

F. E. Warren AFB proposes to construct several detention ponds and channels as part of a base-wide storm water run-off project. Pond I of this project is located just outside the east Camp Carlin boundary, in the Fort D. A. Russell National Historic Landmark (48-LA- 71). The pond will be excavated by mechanical earthmoving equipment and a berm will be constructed along the south and west sides of the pond. A drainage channel will connect the pond to Crow Creek to the south. The purpose of the...