This report presents the results of cultural resources investigations conducted by Tetra Tech, Inc. at F.E. Warren Air Force Base (AFB}, Wyoming from May to October 1988. The work consisted of intensive archaeological survey and testing, monitoring of Explosive Ordnance Disposal (EOD) clearance, and evaluation of sites as part of impact assessment for the proposed Peacekeeper Rail Garrison program. Western Public History Associates, a Tetra Tech subcontractor, conducted archival research on...
Cultural Resources Investigations for Explosive Ordnance Disposal at F.E. Warren AFB, Wyoming: Volume I (1988)
From May 4 through July 11, 1987, cultural resource investigations were conducted by Tetra Tech, Inc. personnel at F.E. Warren Air Force Base (AFB), Wyoming. The study included intensive and reconnaissance surveys, site testing, monitoring, and reevaluation of National Register of Historic Places (NRHP) eligible sites. Seventeen prehistoric sites, 17 historic sites, 80 isolated finds (IFs), and 27 modern features were recorded in the project area. The project area consisted of 2,235 acres in the...
Cultural Resources Investigations for Explosive Ordnance Disposal at F.E. Warren AFB, Wyoming: Volume II (1988)
From May 4 through July 11, 1987, cultural resource investigations were conducted by Tetra Tech, Inc. personnel at F.E. Warren Air Force Base (AFB), Wyoming. The study included intensive and reconnaissance surveys, site testing, monitoring, and reevaluation of National Register of Historic Places (NRHP) eligible sites. Seventeen prehistoric sites, 17 historic sites, 80 isolated finds (IFs), and 27 modern features were recorded in the project area. The project area consisted of 2,235 acres in the...
F.E. Warren AFB Project Metadata
Metadata for the F.E. Warren AFB collection.
Mitigation Plan for Cultural Resources Affected by Peacekeeper Rail Garrison Construction, F.E. Warren Air Force Base, Cheyenne, Wyoming (1990)
In 1986, President Reagan announced his decision to begin development of the Rail Garrison basing mode for the deployment of Peacekeeper missiles. In this basing mode, Peacekeeper missiles would be deployed on trains garrisoned at specified Air Force installations. F.E. Warren Air Force Base (AFB) near Cheyenne, Wyoming, was designated by the President as the Main Operating Base and the first garrison installation. Construction of Peacekeeper Rail Garrison facilities at F. E. Warren AFB is...
Peacekeeper Program Cultural Resources Technical Report 4: Fort D.A. Russell/ F.E. Warren, Volume I (1987)
As part of the U.S. Air Force Peacekeeper Program, historical archaeological investigations were conducted from July 1983 to June 1985 at various proposed and final project localities within and adjacent to the Fort David A. Russell/Francis E. Warren Historic District on F.E. Warren Air Force Base in Cheyenne, Wyoming. Thirty-eight historic archaeological sites were identified within proposed project areas using historic maps, plans, accounts, perspectives, and aerial photographs that were...
Peacekeeper Program Cultural Resources Technical Report 4: Fort D.A. Russell/ F.E. Warren, Volume II (1987)
As part of the U.S. Air Force Peacekeeper Program, historical archaeological investigations were conducted from July 1983 to June 1985 at various proposed and final project localities within and adjacent to the Fort David A. Russell/Francis E. Warren Historic District on F.E. Warren Air Force Base in Cheyenne, Wyoming. The subsequent report is divided into two volumes. Volume I (tDAR ID# 470774) contains the main text and Volume II the appendices to the main volume. To enhance the readability...
Peacekeeper Program: Preliminary Component Effect Report, Energy Management and Control System, F.E. Warren Air Force Base, Wyoming (1985)
As outlined in the Peacekeeper Program Cultural Resources Management Plan (U.S. Air Force 1984), the Air Force is preparing a series of Component Effect Reports (CERs) covering proposed actions required for system deployment. This document is an abbreviated report reviewing the Energy Management and Control System (EMCS) prior to the 30% design review. A complete CER will be produced after 30% design review when final plans are available. The EMCS component consists of installing fiber optic...