AZ T:10:84 (ASM) (Site Name Keyword)
1-14 (14 Records)
The results of additional Class 3 cultural resources surveys for the Pinal West to Dinosaur Extra-high Voltage Transmission Line Project are presented in this report. The transmission line is being constructed by the Salt River Project Agricultural Improvement and Power District (SRP); it will link the Pinal West, Santa Rosa, Pinal Central, Abel, and Dinosaur Substations located in south-central Arizona. The results from the bulk of cultural resources surveys for the...
Archaeological Monitoring and Discovery Plan for a Sign Rehabilitation and Replacement Project on Interstate 10 (Mileposts 145.5-156.3) and Several Crossroads in the Cities of Phoenix and Tempe, Maricopa County, Arizona (2004)
The Arizona Department of Transportation (ADOT) intends to conduct a sign rehabilitation and replacement project on Interstate 10 (1-10) from milepost (MP) 145.5-156.3 in the cities of Phoenix and Tempe, Maricopa County, Arizona (Figure 1). In addition to the 1-10 mainline, the project also will include sign installation and replacement on the following crossroads: 3rd Street, 7th Street, 16th Street, Washington Street, Jefferson Street, Sky Harbor Circle, Buckeye Road, 24th...
A Class I Cultural Resources Inventory for the Pinal West to Southeast Valley/Browning 500 kV Project, Pinal and Maricopa Counties, Arizona (2004)
Greystone Environmental Consultants, Inc., on behalf of Salt River Project Agricultural Improvement and Power District (SRP), has developed this Class I Cultural Resources Inventory for the Pinal West to Southeast Valley/Browning 500 kV Project (Project) as part of the Certificate of Environmental Compatibility (CEC) Application. SRP contracted with Greystone Environmental Consultants, Inc. (Greystone) to complete the Class I report. The Project includes the construction of one single circuit...
A Class I Cultural Resources Inventory of the North-South Corridor Study, Pinal County, Arizona (2011)
Under contract with the Arizona Department of Transportation (ADOT), HDR Engineering, Inc. (HDR), has been tasked with the preliminary planning and predesign of a north-south highway corridor in Pinal County, Arizona (Federal Highway Administration Project No. STP-999-A [BBM]; TRACS No. 999 PN H7454 O1L). This highway will link Interstate 10 (I-10), in the vicinity of Picacho, to U.S. Highway 60 (also known as the Superstition Freeway), in the vicinity of Apache Junction. HDR has subcontracted...
A Cultural Resource Survey for the Proposed Southwest Valley 500kV Transmission Line Project, Maricopa County, Arizona (2002)
The proposed project consists of approximately 37 miles of 500 kilovolt (kV) transmission line to interconnect electric generation resources in the west valley with the existing 230kV system in the metropolitan Phoenix area. Also, the proposed 500kV transmission line will be double circuited with a 230kV transmission line for approximately 10 miles. The double circuit 500/230kV transmission line will extend between the proposed Southwest Valley Substation to the existing Liberty ...
Cultural Resources Survey for the Pinal West to Dinosaur Extra-High Voltage Transmission Line, Pinal County, Arizona (2009)
Class III cultural resources survey for an extra-high voltage transmission line connecting the Pinal West, Santa Rosa, Pinal Central, Abel, and Dinosaur Substations in Pinal County, Arizona.
Cultural Resources Survey for the SRP Dinosaur-to-Hunt Substations 12kV/69kV Electric Lines, Pinal County, Arizona (2007)
Class III cultural resources survey for 12kV/69kV electric lines connecting the Dinosaur Substation and the Hunt Substation southeast of Queen Creek, Pinal County, Arizona.
Cultural Resources Survey for the SRP Palo Verde to Pinal West 500 kV Transmission Lines, Maricopa and Pinal Counties, Arizona (2007)
This report presents the results of Class III cultural resources surveys conducted for the Palo Verde to Pinal West Transmission Line Project. The work was sponsored by Salt River Project (SRP) in support of two proposed 500 kV transmission lines that will connect the existing Hassayampa Switchyard, west of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona. The cultural resources studies described here include three previous archaeological...
A Cultural Resources Survey of Approximately 68 Acres of Salt River Project Land South of Washington Street, Tempe, Maricopa County, Arizona (2001)
On December 6, 2000, Archaeological Research Services, Inc. (ARS) conducted a cultural resources survey of approximately 68 acres of land owned by the Salt River Project in northwestern Tempe, Maricopa County, Arizona. The project area is bounded on the north by Washington Street, on the south by the Union Pacific Railroad tracks, on the east by a property boundary approximately 600 feet west of Center Parkway, and on the west by Priest Drive.The project area is being considered for the...
A Cultural Resources Survey of the Proposed Hassayampa-Jojoba Transmission Line, Maricopa County, Arizona (2002)
GBPP (Gila Bend Power Partners) proposes to construct and operate a 500kV transmission line, which will deliver electrical power from the Hassayampa Switchyard south of Wintersburg, Arizona to the Jojoba Switchyard currently under construction in south-central Maricopa County, Arizona. The project will increase the transmission of electrical power into areas surrounding metropolitan Phoenix, and will promote economic development of benefit to the people of Arizona. GBPP retained EPG...
Data Recovery Plan for the SRP Dinosaur-to-Hunt Substations 12kV/69kV Electric Lines, Pinal County, Arizona (2007)
Salt River Project Agricultural Improvement and Power District (SRP) plans to construct new 12kV /69kV electric lines between the Dinosaur and Hunt substations east of Queen Creek, Arizona. A cultural resources survey has determined that portions of nine archaeological sites which meet criteria for inclusion on the Arizona and National Register of Historic Places are present within the electric lines corridor (Clark 2007). SRP has further established that construction activity for the...
Draft: Treatment and Work Plan for Archaeological Investigations and Monitoring at Eight Sites Along the Southwest Valley 500 kV Transmission Line Project, Maricopa County, Arizona (2002)
APS and SRP were issued a Certificate of Environmental Compatibility (CEC) by the Arizona Corporation Commission for their Southwest Valley 500kV Transmission Line Project (Southwest Valley Project). The project consists of approximately 37 miles of 500 kilovolt (kV) transmission line to interconnect electric generation resources in the west valley with the existing 230kV system in the metropolitan Phoenix area.
The El Paso Natural Gas Line No. 2000 Conversion Project: An Archaeological Re-Survey of the Former All American Pipeline Across La Paz, Yuma, Maricopa, Pinal, Pima, and Cochise Counties, Arizona (2000)
In April and May 2000, SWCA, Inc., Environmental Consultants (SWCA) conducted cultural resource surveys for EPNG's Line No. 2000 Project, surveying the former All American Pipeline in Cochise, La Paz, Maricopa, Pima, and Pinal counties for the Arizona segment. At the request of EPNG, SWCA began the cultural resources survey for this project in April 2000 in support of an Environmental Assessment (EA) being prepared by ENSR, Inc., in conjunction with a pipeline acquisition, conversion, operation...
Treatment and Data Recovery Plan for the SRP Palo Verde to Pinal West 500 kV Transmission Line, Maricopa and Pinal Counties, Arizona (2007)
Salt River Project Agricultural Improvement and Power District (SRP) plans to construct a new 500 kV transmission line between the existing Hassayampa Switchyard, west of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona (Figure 1). Designated the Palo Verde to Pinal West (PV-PW) transmission line, this powerline is the first of two that SRP plans to eventually construct between the Hassayampa Switchyard and...