Rockpile (Site Type Keyword)
1-5 (5 Records)
The Bureau of Reclamation (Reclamation), United States Department of the Interior, was in the initial stages of the Water Management Project designed to bring Central Arizona Project water to the Gila River Indian Community (GRIC). Under terms of a contract signed in 1992 with the GRIC, facilities designed and constructed by Reclamation would deliver 173,000 acre-feet of water annually onto the reservation. Federal law mandates consideration of potential impacts of such projects upon cultural...
An Archaeological Survey of a Proposed Landfill, Salt River Pima-Maricopa Indian Community, Maricopa County, Arizona (1993)
Archaeological Consulting Services, Ltd. (ACS) conducted a cultural resources survey on the Salt River Pima-Maricopa Indian Community for a proposed landfill site. The survey, requested by Terry Leonard of the SRPMIC, was undertaken to identify and assess cultural resources that might be impacted by the development of the landfill. Twenty-three sites were identified, 18 prehistoric and five historic. Nine of the prehistoric sites represent lithic scatters, four are artifact scatters, and five...
Boundary Delineation and Limited Testing of Several Sites on the Fort McDowell Indian Reservation, Maricopa County, Arizona (1994)
Archaeological Consulting Services, Ltd. (ACS) conducted survey of 200 acres and limited testing of cultural resources on Fort McDowell Mohave-Apache Indian Community (FMIC) land at the request of Mr. Jon Czaplicki of the Bureau of Reclamation (Reclamation). The work was performed to define the boundaries of archaeological sites to be avoided by agricultural development. Eight sites were slated for preservation; however, only seven sites were relocated and flagged, and two new sites were...
A Cultural Resources Survey of 17.5 Miles of State Route 88, the Apache Trail, Between Apache Junction and Tortilla Flat, Pinal and Maricopa Counties, Arizona (1995)
Between April 15 and June 14, 1993, Archaeological Research Services, Inc. performed a cultural resources survey of State Route 88 (the Apache Trail). The right-of-way varies from 66 to 200 feet, but construction as-builts were not available. Therefore, the Arizona Department of Transportation requested that a 200 foot wide right-of-way be surveyed for the entire project length unless clearly marked property boundaries or other right-of-way indications were present. The 17.5 mile long survey...
Settlement, Subsistence, and Specialization In the Northern Periphery: The Waddell Project. Vols. 1 and 2 (1989)
Under the sponsorship of the Bureau of Reclamation, the New Waddell Dam Borrow Areas Mitigative Data Recovery Project, more simply known as the Waddell Project, performed data recovery at 17 sites in the vicinity of Lake Pleasant, Arizona. Supplemental surveys conducted under the same contract added two sites to the inventory slated for investigation. The project area, composed of multiple survey areas, was spread across two drainages, the Agua Fria and New River, in what is considered the...