Archaeological Monitoring for a Sewer Flow Monitoring Station Installation Project along 59th Avenue in Phoenix, Maricopa County, Arizona

Author(s): Jewel Touchin

Year: 2013

Summary

The project consists of the installation of a sewer flow monitoring station. The COP Archaeology Office reviewed this project and provided recommendations in a March 16, 2012, Archaeological Assessment Form. The COP Archaeology Assessment notes that the entire APE is located within one archaeological site (AZ T:12:52 [ASM]/ Pueblo del Alamo). The COP Archaeology Office recommended that monitoring be conducted for all portions of the undertaking beyond the area that was investigated during a previous project (Lindley 2004). The Lindley (2004) project involved archaeological monitoring of the excavation of a temporary sewer line along the east side of 59th Avenue.

No prehistoric or historic features were found within the excavated trenches as a result of the monitoring. Although no prehistoric or historic features were found, = more than 150 artifacts were identified as a result of the monitoring. The artifacts were located within the previously established boundaries of AZ T:12:52 (ASM)/Pueblo del Alamo and are considered to be part of the general artifact distribution within the site. Their research potential has been realized through recordation, and no further work is recommended for them.

Cite this Record

Archaeological Monitoring for a Sewer Flow Monitoring Station Installation Project along 59th Avenue in Phoenix, Maricopa County, Arizona, 010. Jewel Touchin. 2013 ( tDAR id: 445575) ; doi:10.48512/XCV8445575

This Resource is Part of the Following Collections

Spatial Coverage

min long: -112.201; min lat: 33.389 ; max long: -112.169; max lat: 33.437 ;

Individual & Institutional Roles

Contact(s): City of Phoenix Archaeology Office

Contributor(s): Mark L. Chenault

Prepared By(s): Jacobs

Submitted To(s): City of Phoenix Street Transportation Department

Record Identifiers

Project Report No. (s): 2012-010

Burial Agreement Case No. (s): 2012-059

Accession No. (s): 2012-662

Project Specific Permit No. (s): 2012-132ps

Cost Center No.(s): WS90160085

Arizona Antiquities Act Blanket Permit No. (s): 2012-044bl

PGM Project No. (s): 2012-021

File Information

  Name Size Creation Date Date Uploaded Access
2012-010-59th-Avenue-Sewer-Monitoring-report_OCR_PDFA.pdf 15.81mb Jan 1, 2013 May 10, 2018 1:47:45 PM Confidential
This file is the unredacted version of the resource.
2012-010-59th-Avenue-Sewer-Monitoring-report_OCR_PDFA_Redacted... 20.43mb Mar 25, 2021 10:42:44 AM Public
This file is the redacted version of the resource.

Accessing Restricted Files

At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below

Contact(s): City of Phoenix Archaeology Office

This Resource is Part of the Following User Created Collections