Preclassic Hohokam period (Temporal Keyword)

1-22 (22 Records)

An Archaeological Survey in the Blackwater Area, Volume 1: The History of Human Settlement in the Blackwater Area (1994)
DOCUMENT Full-Text David A. Gregory. Gary Huckleberry.

The Bureau of Reclamation (Reclamation), United States Department of the Interior, was in the initial stages of the Water Management Project designed to bring Central Arizona Project water to the Gila River Indian Community (GRIC). Under terms of a contract signed in 1992 with the GRIC, facilities designed and constructed by Reclamation would deliver 173,000 acre-feet of water annually onto the reservation. Federal law mandates consideration of potential impacts of such projects upon cultural...


Cultural Resources Assessment of 22 Archaeological Sites Located Along Reaches 1 and 2 of the Fannin-McFarland Portion of the CAP Canal
PROJECT USDI Bureau of Reclamation, Phoenix Area Office.

The Bureau of Reclamation has developed an archaeological site database for the Central Arizona Project (CAP) canal main stem based on the Class III survey data that includes all previously recorded sites. An unknown number of these sites were either destroyed by construction or excavation, while others are no longer located within the CAP right-of-way (ROW). To assist Reclamation in checking the accuracy of its site database, Archaeological Consulting Services, Ltd. (ACS) was asked to revisit...


Cultural Resources Assessment of 22 Archaeological Sites Located Along Reaches 1 and 2 of the Fannin-McFarland Portion of the CAP Canal (2006)
DOCUMENT Full-Text Ilya Berelov. Teresa L. Pinter.

The Bureau of Reclamation has developed an archaeological site database for the Central Arizona Project (CAP) canal main stem based on the Class III survey data that includes all previously recorded sites. An unknown number of these sites were either destroyed by construction or excavation, while others are no longer located within the CAP right-of-way (ROW). To assist Reclamation in checking the accuracy of its site database, Archaeological Consulting Services, Ltd. (ACS) was asked to revisit...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Ceramic Data (2012)
DATASET Archaeological Consulting Services, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Flotation Data (2012)
DATASET Archaeological Consulting Services, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Lithic Data (2012)
DATASET Archaeological Consulting Services, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Photolog (2012)
DOCUMENT Full-Text Archaeological Consulting Services, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Photos (2012)
IMAGE Archaeological Consulting Services, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Pollen Data (2012)
DATASET Archaeological Consulting Services, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report for Phased Data Recovery at AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Redacted Pages (2012)
DOCUMENT Full-Text Uploaded by: ACS Tempe

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Redacted Report (2012)
DOCUMENT Full-Text Uploaded by: ACS Tempe

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Final Report For Phased Data Recovery At AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Shell Data (2012)
DATASET Archaeological Consulting Sevices, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Letter Preliminary Report of Phase 2 Data Recovery at AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona (2012)
DOCUMENT Full-Text E. Melanie Ryan.

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Phase 1 Data Testing at AZ U:15:1(REC) on Private Land and Mapping of Historic Architecture at AZ AA:3:215(ASM) and AZ U:16:303(ASM) on Federal Land near Ashurst-Hayden Diversion Dam, Pinal County, Arizona
PROJECT Robert Stokes. USDI Bureau of Reclamation, Phoenix Area Office. E. Melanie Ryan.

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Phase 1 Data Testing at AZ U:15:1(REC) on Private Land and Mapping of Historic Architecture at AZ AA:3:215(ASM) and AZ U:16:303(ASM) on Federal Land near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Photo Log (2012)
DOCUMENT Full-Text Archaeological Consulting Sevices, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Phase 1 Data Testing at AZ U:15:1(REC) on Private Land and Mapping of Historic Architecture at AZ AA:3:215(ASM) and AZ U:16:303(ASM) on Federal Land near Ashurst-Hayden Diversion Dam, Pinal County, Arizona: Photos (2012)
IMAGE Archaeological Consulting Services, Ltd..

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Phase 2 Data Recovery at AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal (AZ U:15:8[REC]) Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona
PROJECT Robert Stokes. USDI Bureau of Reclamation, Phoenix Area Office.

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Photolog for Photos from Cultural Resources Assessment of 22 Archaeological Sites Located Along Reaches 1 and 2 of the Fannin-McFarland Portion of the CAP Canal (2006)
DOCUMENT Full-Text Archaeological Consulting Services, Ltd..

The Bureau of Reclamation has developed an archaeological site database for the Central Arizona Project (CAP) canal main stem based on the Class III survey data that includes all previously recorded sites. To assist Reclamation in checking the accuracy of its site database, Archaeological Consulting Services, Ltd. (ACS) was asked to revisit 22 sites that had been identified in Reaches 1 and 2 of the Fannin-McFarland portion of the CAP canal. This is the photolog for the photos taken from the...


Photos from the Cultural Resources Assessment of 22 Archaeological Sites Located Along Reaches 1 and 2 of the Fannin-McFarland Portion of the CAP Canal (2006)
IMAGE Archaeological Consulting Services, Ltd.. Ilya Berelov.

The Bureau of Reclamation has developed an archaeological site database for the Central Arizona Project (CAP) canal main stem based on the Class III survey data that includes all previously recorded sites. To assist Reclamation in checking the accuracy of its site database, Archaeological Consulting Services, Ltd. (ACS) was asked to revisit 22 sites that had been identified in Reaches 1 and 2 of the Fannin-McFarland portion of the CAP canal. These are the photos taken from the cultural...


Preliminary Report for Phase 1 Data Testing at AZ U:15:1(REC) on Private Land and Mapping of Historic Architecture at AZ AA:3:215(ASM) and AZ U:16:303(ASM) on Federal Land near Ashurst-Hayden Diversion Dam, Pinal County, Arizona (2011)
DOCUMENT Full-Text E. Melanie Ryan. Andrea Gregory. Thomas E. Jones. Michael Droz. Robert Stokes.

As authorized under the Arizona Water Settlements Act of 2004, the San Carlos and Irrigation Drainage District (SCIDD) is undertaking a 10-year rehabilitation project of its irrigation system. SCIDD is the non-Indian irrigation component of the San Carlos Irrigation Project (SCIP), which provides irrigation water to the communities of Florence, Coolidge, and Casa Grande in Pinal County, Arizona. The initial focus of the SCIDD Rehabilitation Project is the rehabilitation of the Ashurst-Hayden...


Redacted Pages for Letter Preliminary Report of Phase 2 Data Recovery at AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona (2012)
DOCUMENT Full-Text E. Melanie Ryan.

Redacted pages for Letter Preliminary Report of Phase 2 Data Recovery at AZ U:15:1(REC) on SCIDD Property and Trenching for Additional Canal Exposures on Federal Land Near Ashurst-Hayden Diversion Dam, Pinal County, Arizona


Roosevelt Community Development Study-Center for Desert Archaeology
PROJECT Douglas Craig. Mark Elson. Deborah Swartz. USDI Bureau of Reclamation, Phoenix Area Office. William Doelle.

The Roosevelt Community Development Study (RCD) was one of three data recovery mitigative studies that the Bureau of Reclamation funded to investigate the prehistory of the Tonto Basin in the vicinity of Theodore Roosevelt Dam. The series of investigations constituted Reclamation's program for complying with historic preservation legislation as it applied to the raising and modification of Theodore Roosevelt Dam. Reclamation contracted with Desert Archaeology, Inc. to complete the research for...