SCIP Joint Works Rehabilitation Project

Resources Inside This Collection (Viewing 1-2 of 2)

A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation
  • A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation
    PROJECT David Doyel. USDI Bureau of Reclamation, Phoenix Area Office.

    The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...

  • A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation: Report (1995)
    DOCUMENT Full-Text David Doyel. Joseph Crary. Gina Gage. Karolyn Jackman Jensen.

    The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...