SCIP Joint Works Rehabilitation Project
Site Name Keywords
Escalante Ruin •
Casa Grande Ruins •
Grewe Site •
Las Fosas •
NA18,002(MNA) •
Whip It Site •
AZ U:15:8(ARS) •
Florence-Casa Grande Canal •
Brady Wash Site •
AZ AA:3:80(ASM)
Other Keywords
Research Potential •
Historic Contexts •
Class I overview •
San Carlos Irrigation Project
Culture Keywords
Archaic •
Middle Archaic •
Late Archaic •
Hohokam •
Historic •
Euroamerican •
Historic Native American
Investigation Types
Archaeological Overview •
Records Search / Inventory Checking •
Historic Background Research
Temporal Keywords
Prehistoric •
Historic Euroamerican •
Prehistoric Hohokam •
Historic Aboriginal
Geographic Keywords
Arizona (State / Territory) •
United States of America (Country) •
Pinal County (County) •
North America (Continent) •
Central Arizona •
Pinal County, AZ •
Middle Gila River Valley
Resources Inside This Collection (Viewing 1-2 of 2)
-
A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation
PROJECT
The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...
-
A Class One Overview for the Proposed San Carlos Irrigation Project Joint Works Rehabilitation: Report (1995)
DOCUMENT Full-Text
The Bureau of Reclamation, Phoenix Area Office (Reclamation), undertook the development of a Water Management Plan (WMP) as part of the Central Arizona Project (CAP). In consultation with the San Carlos Irrigation Project (SCIP), the Gila River Indian Community (GRIC), and the San Carlos Irrigation and Drainage District (SCIDD), it was proposed that the Joint Works would require rehabilitation or replacement to facilitate the WMP, specifically the delivery of water to the Pima-Maricopa...