On April 22, 1985, a pedestrian cultural resource survey was conducted for the proposed replacement of the 6th Street Bridge which crosses Crow Creek in Section 26, T14N, R67W. Total area surveyed is approximately 1 acre. The project area has suffered extensive disturbance from previous construction. A light scatter of pre-1920 historic debris was discovered on the north bank of the Creek. The debris does not appear to be significant and the potential for significant deposits appears low. As a precautionary measure; however, construction will be monitored.

Cite this Record

Cultural Resource Inventory Report Replacement of 6th Street Bridge, F.E. Warren Air Force Base, April 1985. William Metz. 1985 ( tDAR id: 470758) ; doi:10.48512/XCV8470758

Spatial Coverage

min long: -104.898; min lat: 41.129 ; max long: -104.83; max lat: 41.211 ;

Individual & Institutional Roles

Contact(s): F.E. Warren Air Force Base CRM Manager

Record Identifiers

FEW AFB Project No.(s): 84-0057; 850423

File Information

  Name Size Creation Date Date Uploaded Access
850423--Cultural-Resource-Inventory-Report-Replacement-of-6th-... 655.59kb Oct 5, 2022 11:28:13 AM Confidential

Accessing Restricted Files