Archaeological Survey and Evaluation of Structural Components of the Roosevelt Power Canal, Color Slides Part 1
Part of the Archaeological Survey and Evaluation of Structural Components of the Roosevelt Power Canal project
Creator(s): Archaeological Research Services, Inc.
Year: 1983
Summary
Color slides of power canal components, images # 1-50. PC # stands for the ARS component. Table with list of component descriptions corresponding to these images found in the survey and evaluation report on pages 13 - 18.
This report is located in the tDAR resource: https://core.tdar.org/document/437988/archaeological-survey-and-evaluation-of-structural-components-of-the-roosevelt-power-canal
Cite this Record
Archaeological Survey and Evaluation of Structural Components of the Roosevelt Power Canal, Color Slides Part 1. Archaeological Research Services, Inc.. Tempe, AZ: Archaeological Research Services, Inc. ( tDAR id: 437990) ; doi:10.6067/XCV8437990
Keywords
Culture
Historic
Material
Building Materials
Site Name
Roosevelt Power Canal
Site Type
Agricultural or Herding
•
Bridge
•
Canal or Canal Feature
•
Concrete Slab
•
Culvert
•
Dam
•
Diversion Dam
•
Flume
•
Resource Extraction / Production / Transportation Structure or Features
•
Road, Trail, and Related Structures or Features
•
siphon
•
Sluice Gate
•
Tunnel
•
Water Control Feature
•
Weir
Investigation Types
Architectural Survey
•
Historic Background Research
•
Site Evaluation / Testing
•
Systematic Survey
General
Roosevelt Power Canal
•
Salt River Project
•
SRP
Geographic Keywords
04007 (Fips Code)
•
Apache Trail
•
Arizona (State / Territory)
•
Pinto Creek
•
Schoolhouse Wash
•
Theodore Roosevelt Dam
•
Theodore Roosevelt Lake
•
Tonto National Forest
Temporal Keywords
1900s
•
20th Century
•
Early 20th Century
•
Historic Period
•
Mid 20th Century
Temporal Coverage
Calendar Date: 1906 to 1952 (Use history and operation of Roosevelt Power Canal)
Calendar Date: 1902 to 1904 (Feasibility assessment and survey of Roosevelt Power Canal))
Calendar Date: 1904 to 1906 (Initial construction of Roosevelt Power Canal)
Spatial Coverage
min long: -111.165; min lat: 33.618 ; max long: -110.912; max lat: 33.681 ;
Individual & Institutional Roles
Contact(s): Salt River Project Cultural Resource Manager
Contributor(s): James E. Ayres; U.S. Bureau of Reclamation
Landowner(s): Tonto National Forest
Sponsor(s): Salt River Project
Prepared By(s): Archaeological Research Services, Inc.
Submitted To(s): Salt River Project
Record Identifiers
NADB document id number(s): 1000066
SRP Library Barcode No.(s): 00030576
NADB citation id number(s): 000000012068
File Information
Name | Size | Creation Date | Date Uploaded | Access | |
---|---|---|---|---|---|
Image1.jpg | 3.40mb | Sep 7, 2017 11:02:09 AM | Confidential | ||
PC 1A - View of the South End of the diversion dam at the outlet for the intake channel and the gatehouse, ARS-1A. Looking Southeast. | |||||
Image2.jpg | 4.83mb | Sep 7, 2017 11:02:10 AM | Confidential | ||
PC 1A - Gate house | |||||
Image3.jpg | 3.36mb | Sep 7, 2017 11:02:10 AM | Confidential | ||
PC 1A - View of the Diversion dam and gatehouse, ARS-1A. Looking North from ARS-1B. | |||||
Image4.jpg | 3.60mb | Sep 7, 2017 11:02:11 AM | Confidential | ||
PC 1B - Concrete slab | |||||
Image5.jpg | 3.63mb | Sep 7, 2017 11:02:11 AM | Confidential | ||
PC 2A - Tunnel exit | |||||
Image6.jpg | 3.57mb | Sep 7, 2017 11:02:11 AM | Confidential | ||
PC 2B - Sluice gate mechanism | |||||
Image7.jpg | 3.33mb | Sep 7, 2017 11:02:12 AM | Confidential | ||
PC 3 - 48" drainage flume and bridge | |||||
Image8.jpg | 3.85mb | Sep 7, 2017 11:02:12 AM | Confidential | ||
PC 4D - View of sluice gate, ARS-4D; looking Northwest. | |||||
Image9.jpg | 2.92mb | Sep 7, 2017 11:02:12 AM | Confidential | ||
PC 4E + D - View of overflow weir and sluice gate; looking Northeast. | |||||
Image10.jpg | 3.28mb | Sep 7, 2017 11:02:12 AM | Confidential | ||
PC 4F + G - View of two concrete slabs, ARS-4F-G; looking West. | |||||
Image11.jpg | 3.47mb | Sep 7, 2017 11:02:12 AM | Confidential | ||
PC 5 - 48" Drainage flume | |||||
Image12.jpg | 3.61mb | Sep 7, 2017 11:02:13 AM | Confidential | ||
PC 6 - 120" Drainage flume and bridge | |||||
Image13.jpg | 3.79mb | Sep 7, 2017 11:02:13 AM | Confidential | ||
PC 7 - 90" Drainage flume | |||||
Image14.jpg | 3.53mb | Sep 7, 2017 11:02:13 AM | Confidential | ||
PC 8 - 60" Drainage flume & overflow weir | |||||
Image15.jpg | 3.31mb | Sep 7, 2017 11:02:13 AM | Confidential | ||
PC 9 - 108' Cut & cover, Lee Wash; View of the spillway, looking South. | |||||
Image16.jpg | 3.27mb | Sep 7, 2017 11:02:13 AM | Confidential | ||
PC 9 - 108' Cut & cover, Lee Wash; View of the exit facade, looking East. | |||||
Image17.jpg | 3.63mb | Sep 7, 2017 11:02:13 AM | Confidential | ||
PC 10 - Lee Tunnel, 122' | |||||
Image18.jpg | 2.94mb | Sep 7, 2017 11:02:14 AM | Confidential | ||
PC 10 - Lee Tunnel, 122' | |||||
Image19.jpg | 3.35mb | Sep 7, 2017 11:02:14 AM | Confidential | ||
PC 12 - 24" pipe culvert | |||||
Image20.jpg | 3.44mb | Sep 7, 2017 11:02:14 AM | Confidential | ||
PC 13 - 5' arch culvert | |||||
Image21.jpg | 4.77mb | Sep 7, 2017 11:02:14 AM | Confidential | ||
PC 14 - Vertical pipes in canal berm | |||||
Image22.jpg | 3.70mb | Sep 7, 2017 11:02:14 AM | Confidential | ||
PC 15 - View of a bridge, ARS-15. Looking East. | |||||
Image23.jpg | 3.33mb | Sep 7, 2017 11:02:14 AM | Confidential | ||
PC 16 - Tunnel, 428' | |||||
Image24.jpg | 4.71mb | Sep 7, 2017 11:02:15 AM | Confidential | ||
PC 17 - Drainage flume & overflow weir | |||||
Image25.jpg | 3.34mb | Sep 7, 2017 11:02:15 AM | Confidential | ||
PC 17 - Drainage flume & overflow weir | |||||
Image26.jpg | 3.85mb | Sep 7, 2017 11:02:15 AM | Confidential | ||
PC 18 - Tunnel, 129' | |||||
Image27.jpg | 4.10mb | Sep 7, 2017 11:02:15 AM | Confidential | ||
PC 19 - Tunnel, 271' | |||||
Image28.jpg | 3.72mb | Sep 7, 2017 11:02:15 AM | Confidential | ||
PC 20 - 9' square culvert | |||||
Image29.jpg | 3.47mb | Sep 7, 2017 11:02:16 AM | Confidential | ||
PC 21 - Bridge (2) | |||||
Image30.jpg | 3.41mb | Sep 7, 2017 11:02:16 AM | Confidential | ||
PC 22 - Wehrli Tunnel, 151' | |||||
Image31.jpg | 3.66mb | Sep 7, 2017 11:02:16 AM | Confidential | ||
PC 23 - 30" drainage flume | |||||
Image32.jpg | 3.42mb | Sep 7, 2017 11:02:16 AM | Confidential | ||
PC 24 - View of 11' 6" Double arch culvert; looking East. | |||||
Image33.jpg | 3.27mb | Sep 7, 2017 11:02:16 AM | Confidential | ||
PC 26 - Two sluice gate | |||||
IMG034.jpg | 3.59mb | Sep 7, 2017 11:02:17 AM | Confidential | ||
PC 26 - View of sluice gates, ARS-26. Looking East. | |||||
IMG035.jpg | 4.12mb | Sep 7, 2017 11:02:17 AM | Confidential | ||
PC 27 - Overflow weir | |||||
IMG036.jpg | 3.86mb | Sep 7, 2017 11:02:17 AM | Confidential | ||
PC 29 - Pipe culver | |||||
IMG037.jpg | 4.35mb | Sep 7, 2017 11:02:17 AM | Confidential | ||
PC 30 - Bridge | |||||
IMG038.jpg | 3.31mb | Sep 7, 2017 11:02:17 AM | Confidential | ||
PC 31 - 16" Double Pipe Culvert | |||||
IMG039.jpg | 3.43mb | Sep 7, 2017 11:02:18 AM | Confidential | ||
PC 32 - 30" pipe culvert | |||||
IMG040.jpg | 3.74mb | Sep 7, 2017 11:02:18 AM | Confidential | ||
PC 33 - 48" drainage flume | |||||
IMG041.jpg | 3.47mb | Sep 7, 2017 11:02:18 AM | Confidential | ||
PC 34 - 30" pipe culvert | |||||
IMG042.jpg | 3.13mb | Sep 7, 2017 11:02:18 AM | Confidential | ||
PC 35 - 5' arch culvert | |||||
IMG043.jpg | 3.07mb | Sep 7, 2017 11:02:19 AM | Confidential | ||
PC 36 - 30" pipe culvert | |||||
IMG044.jpg | 3.98mb | Sep 7, 2017 11:02:19 AM | Confidential | ||
PC 37 - 5' arch culvert | |||||
IMG045.jpg | 2.99mb | Sep 7, 2017 11:02:19 AM | Confidential | ||
PC 38 - View of 30" double pipe culvert; looking South. | |||||
IMG046.jpg | 3.12mb | Sep 7, 2017 11:02:19 AM | Confidential | ||
PC 38 - 30" double pipe culvert | |||||
IMG047.jpg | 3.88mb | Sep 7, 2017 11:02:19 AM | Confidential | ||
PC 39 - Overflow weir | |||||
IMG048.jpg | 3.09mb | Sep 7, 2017 11:02:19 AM | Confidential | ||
PC 40 - View of sluice gates, sediment basin, Pinto Creek, ARS-40; looking South. | |||||
IMG049.jpg | 3.50mb | Sep 7, 2017 11:02:19 AM | Confidential | ||
PC 41 - Pinto Siphon, entry gates | |||||
IMG050.jpg | 3.19mb | Sep 7, 2017 11:02:20 AM | Confidential | ||
PC 41 - View of the entry into the Pinto Creek Siphon, sediment basin, ARS-41; looking West. |
Accessing Restricted Files
At least one of the files for this resource is restricted from public view. For more information regarding access to these files, please reference the contact information below
Contact(s): Salt River Project Cultural Resource Manager