Archaeological Survey and Evaluation of Structural Components of the Roosevelt Power Canal
PROJECT Salt River Project.

During December, 1982, and January, 1983, representatives of the Environmental Services and Civil Engineering Departments of Salt River Project consulted with Archaeological Research Services, Inc. regarding the status of archaeological and historical information pertaining to the Roosevelt Power Canal, an early 20th century structure located in the Roosevelt Lake vicinity. Archaeological Research Services, Inc. had developed recent information on the Power Canal due to its participation in the...


Archaeological Survey and Evaluation of Structural Components of the Roosevelt Power Canal (1983)
DOCUMENT Full-Text James E. Ayers.

During December, 1982, and January, 1983, representatives of the Environmental Services and Civil Engineering Departments of Salt River Project consulted with Archaeological Research Services, Inc. regarding the status of archaeological and historical information pertaining to the Roosevelt Power Canal, an early 20th century structure located in the Roosevelt Lake vicinity. Archaeological Research Services, Inc. had developed recent information on the Power Canal due to its participation in the...


Archaeological Survey and Evaluation of Structural Components of the Roosevelt Power Canal, Color Slides Part 1 (1983)
IMAGE Archaeological Research Services, Inc..

Color slides of power canal components, images # 1-50. PC # stands for the ARS component. Table with list of component descriptions corresponding to these images found in the survey and evaluation report on pages 13 - 18. This report is located in the tDAR resource: https://core.tdar.org/document/437988/archaeological-survey-and-evaluation-of-structural-components-of-the-roosevelt-power-canal


Archaeological Survey and Evaluation of Structural Components of the Roosevelt Power Canal, Color Slides Part 2 (1983)
IMAGE Archaeological Research Services, Inc..

Color slides of power canal components, images # 51-100. PC # stands for the ARS component. Table with list of component descriptions corresponding to these images found in the survey and evaluation report on pages 13 - 18. This report is located in the tDAR resource: https://core.tdar.org/document/437988/archaeological-survey-and-evaluation-of-structural-components-of-the-roosevelt-power-canal


Archaeological Survey and Evaluation of Structural Components of the Roosevelt Power Canal, Color Slides Part 3 (1983)
IMAGE Archaeological Research Services, Inc. .

Color slides of power canal components, images # 101-123. PC # stands for the ARS component. Table with list of component descriptions corresponding to these images found in the survey and evaluation report on pages 13 - 18. This report is located in the tDAR resource: https://core.tdar.org/document/437988/archaeological-survey-and-evaluation-of-structural-components-of-the-roosevelt-power-canal


The Archaeology of Schoolhouse Point Mesa, Roosevelt Platform Mound Study: Report on the Schoolhouse Point Mesa Sites, Schoolhouse Management Group, Pinto Creek Complex (1997)
DOCUMENT Full-Text Owen Lindauer.

The Roosevelt Platform Mound Study (RPMS) was one of three mitigative data recovery studies that the Bureau of Reclamation funded to investigate the prehistory of the Tonto Basin in the vicinity of Theodore Roosevelt Dam. The series of investigations constituted Reclamation's program for complying with historic preservation legislation as it applied to the raising and modification of Theodore Roosevelt Dam. Reclamation contracted with the Arizona State University Office of Cultural Resource...


Cultural Resources Survey of Approximately 28.6 Miles of State Route 88, the Apache Trail, between Tortilla Flat and Theodore Roosevelt Dam, Maricopa County, Arizona (1995)
DOCUMENT Full-Text David D. Barz.

From December 5, 1994 to January 12, 1995, Archaeological Research Services, Inc. (ARS) performed a Class III (Intensive Field Inventory) cultural resources survey within a 200 ft wide corridor along State Route 88 (SR 88) between mileposts 213.4 and 242 in the northern Superstition Mountains on Tonto National Forest (TNF) lands. The Arizona Department of Transportation (ADOT) requested the survey in anticipation of planned maintenance activities. This project was completed under the conditions...


A Design for Salado Research (1990)
DOCUMENT Full-Text Uploaded by: Keith Kintigh

The Roosevelt Platform Mound Study (RPMS) was one of three mitigative data recovery studies that the Bureau of Reclamation funded to investigate the prehistory of the Tonto Basin in the vicinity of Theodore Roosevelt Dam. The series of investigations constituted Reclamation's program for complying with historic preservation legislation as it applied to the raising and modification of Theodore Roosevelt Dam. Reclamation contracted with the Arizona State University Office of Cultural Resource...


Developing Perspectives on Tonto Basin Prehistory (1992)
DOCUMENT Full-Text Uploaded by: Alaina Harmon

This monograph is a collection of papers presented at the 1991 Annual Meeting of the Society for American Archaeology, New Orleans. These papers present preliminary results after two years of work on the eight year mitigation program investigating Salado Platform Mound Villages in the Tonto Basin, Arizona. Each paper constitutes an individual chapter. They include: 1. Introduction 2. Pursuing Southwestern Social Complexity in the 1990s 3. Modeling the Development of Complexity in the...


HAER No. AZ-4, Roosevelt Power Canal and Diversion Dam, Gila County, Arizona: Photographs, Written Historical and Descriptive Data, Reduced Copies of Drawings (1984)
DOCUMENT Full-Text David M. Introcaso.

Historic American Engineering Record (HAER) No. AZ-4 presents a written historical summary and relevant historical documentation about the construction and use of the Roosevelt Power Canal and Diversion Dam in the vicinity of Theodore Roosevelt Lake in south-central Arizona. The report contains a narrative description, photographs, drawings, and maps. The Roosevelt Power Canal was built as an integral part of the Salt River Project and represents the U.S. Reclamation Service's first involvement...


HAER No. AZ-6A, Theodore Roosevelt Dam, Power Plant, Salt River, Phoenix Vicinity, Maricopa County, Arizona: Photographs, Written Historical and Descriptive Data (1996)
DOCUMENT Full-Text Christine Pfaff.

Historic American Engineering Record (HAER) No. AZ-6A examines the origins, construction, use, and significance of the Theodore Roosevelt Dam Power Plant and Transformer House, located in south-central Arizona along the Salt River. The report contains a narrative description, drawings, maps, and historic photographs of the dam's power plant and transformer house. The power generating facilities at Roosevelt Dam, beginning with the 1906 temporary plant, were the first ever built by the Bureau...


Historic American Engineering Record, HAER No. AZ-6, Theodore Roosevelt Dam (1992)
DOCUMENT Full-Text Donald C. Jackson.

Roosevelt Dam comprises the key structure in one of the first major federally sponsored reclamation projects in the West. Authorized as one of the Reclamation Service's first projects in 1903, it continues to store water for agricultural lands, homeowners, and industrial concerns in the Phoenix region that are served by the Salt River Project. Used to impound floodwaters of the Salt River, the 280-foot-high Roosevelt Dam was distinguished as the tallest and last major stone masonry gravity dams...


Historic American Engineering Record: Archaeological Survey and Evaluation of Structural Components of the Roosevelt Power Canal (1983)
DOCUMENT Full-Text James E. Ayers.

During December 1982 and January 1983, representatives of the Environmental Services and Civil Engineering Departments of Salt River Project consulted with Archaeological Research Services, Inc. (ARS) regarding the status of archaeological and historical information pertaining to the Roosevelt Power Canal, a historic canal associated with Theodore Roosevelt Dam. As part of a Central Arizona Water Control Study sponsored by the U.S. Bureau of Reclamation and the U.S. Army, Corps of Engineers,...


Historic American Engineering Record: Roosevelt Power Canal and Diversion Dam, Gila County, Arizona (1983)
DOCUMENT Full-Text David M. Introcaso.

Historic American Engineering Record (HAER) No. AZ-4 presents a written historical summary and relevant historical documentation about the construction and use of the Roosevelt Power Canal and Diversion Dam in the vicinity of Theodore Roosevelt Lake in south-central Arizona. The report contains a narrative description, photographs, drawings, and maps. It draws on information from the Archaeological Survey and Evaluation of Structural Components of the Roosevelt Power Canal (see...


Historic American Engineering Record: Theodore Roosevelt Dam (1992)
DOCUMENT Full-Text Donald C. Jackson.

Historic American Engineering Record (HAER) No. AZ-6 examines the origins and construction of Theodore Roosevelt Dam, the first major project to increase the Salt River Valley's water supply beyond that available from the "normal flow" of the Salt River in south-central Arizona. Sponsored by the Arizona Projects Office of the Bureau of Reclamation, this HAER documentation was undertaken because the Roosevelt Dam was dramatically altered in the early 1990s. The alteration served to increase the...


Historic American Engineering Record: Theodore Roosevelt Dam, Power Plant (1996)
DOCUMENT Full-Text Christine Pfaff.

Historic American Engineering Record (HAER) No. AZ-6A examines the origins, construction, use, and significance of the Theodore Roosevelt Dam Power Plant and Transformer House, located in south-central Arizona along the Salt River. The report contains a narrative description, drawings, maps, and historic photographs of the dam's power plant and transformer house. As the key structure in one of the first major federally sponsored Reclamation projects in the West, Theodore Roosevelt Dam...


The Place of the Storehouses: Roosevelt Platform Mound Study, Part 1 (1996)
DOCUMENT Full-Text Owen Lindauer.

The Roosevelt Platform Mound Study (RPMS) was one of three mitigative data recovery studies that the Bureau of Reclamation funded to investigate the prehistory of the Tonto Basin in the vicinity of Theodore Roosevelt Dam. The series of investigations constituted Reclamation's program for complying with historic preservation legislation as it applied to the raising and modification of Theodore Roosevelt Dam. Reclamation contracted with the Arizona State University Office of Cultural Resource...


The Place of the Storehouses: Roosevelt Platform Mound Study, Part 2 (1996)
DOCUMENT Full-Text Owen Lindauer.

The Roosevelt Platform Mound Study (RPMS) was one of three mitigative data recovery studies that the Bureau of Reclamation funded to investigate the prehistory of the Tonto Basin in the vicinity of Theodore Roosevelt Dam. The series of investigations constituted Reclamation's program for complying with historic preservation legislation as it applied to the raising and modification of Theodore Roosevelt Dam. Reclamation contracted with the Arizona State University Office of Cultural Resource...


Research Design for the Roosevelt Community Development Study (1992)
DOCUMENT Full-Text William H. Doelle. Henry D. Wallace. Mark D. Elson. Douglas B. Craig.

The Roosevelt Community Development Study (RCD) was one of three data recovery mitigative studies that the Bureau of Reclamation funded to investigate the prehistory of the Tonto Basin in the vicinity of Theodore Roosevelt Dam. The series of investigations constituted Reclamation's program for complying with historic preservation legislation as it applied to the raising and modification of Theodore Roosevelt Dam. Reclamation contracted with Desert Archaeology, Inc. to complete the research for...


The Roosevelt Bajada Survey, Tonto Basin, Gila County, Central Arizona (1991)
DOCUMENT Full-Text Richard V. N. Ahlstrom. Mark L. Chenault. Kirk C. Anderson.

Between October, 1990, and January, 1991, SWCA, Environmental Consultants conducted archaeological survey of approximately 1,800 acres of Tonto National Forest land in the Roosevelt Basin, central Arizona. This project, the Roosevelt Bajada Survey, was done to provide survey data on portions of the Basin that are not being investigated by Arizona State University (ASU) as part of its Roosevelt Lake Project. The survey recorded 111 new sites and rerecorded five previously known sites; four...


The Roosevelt Community Development Study, Number 13, Volume 1: Introduction and Small Sites (1994)
DOCUMENT Full-Text Mark D. Elson. Deborah L. Swartz.

The Roosevelt Community Development Study (RCD) was one of three data recovery mitigative studies that the Bureau of Reclamation funded to investigate the prehistory of the Tonto Basin in the vicinity of Theodore Roosevelt Dam. The series of investigations constituted Reclamation's program for complying with historic preservation legislation as it applied to the raising and modification of Theodore Roosevelt Dam. Reclamation contracted with Desert Archaeology, Inc. to complete the research for...


The Roosevelt Community Development Study, Number 14, Volume 2: Ceramic Chronology, Technology, and Economics (1995)
DOCUMENT Full-Text Uploaded by: Keith Kintigh

The Roosevelt Community Development Study (RCD) was one of three data recovery mitigative studies that the Bureau of Reclamation funded to investigate the prehistory of the Tonto Basin in the vicinity of Theodore Roosevelt Dam. The series of investigations constituted Reclamation's program for complying with historic preservation legislation as it applied to the raising and modification of Theodore Roosevelt Dam. Reclamation contracted with Desert Archaeology, Inc. to complete the research for...


The Roosevelt Community Development Study: New Perspectives on Tonto Basin Prehistory (1995)
DOCUMENT Full-Text Uploaded by: Francis McManamon

The Roosevelt Community Development Study (RCD) involved the testing and excavation of 27 sites in the Lower Tonto Basin of central Arizona. This is one of three related data recovery projects undertaken in the Tonto Basin for the Bureau of Reclamation prior to the raising of the Roosevelt Lake dam. The results of the RCD project are presented in four Anthropological Papers of the Center for Desert Archaeology. This volume synthesizes data recovered from the RCD excavations to provide a more...


Roosevelt Platform Mound Study
PROJECT Arleyn Simon. Peter McCartney. Glen Rice. USDI Bureau of Reclamation, Phoenix Area Office. Charles Redman. Brenda Shears.

The Roosevelt Platform Mound Study (RPMS) was one of three mitigative data recovery studies that the Bureau of Reclamation funded to investigate the prehistory of the Tonto Basin in the vicinity of Theodore Roosevelt Dam. The series of investigations constituted Reclamation's program for complying with historic preservation legislation as it applied to the raising and modification of Theodore Roosevelt Dam. Reclamation contracted with the Arizona State University Office of Cultural Resource...


Roosevelt Platform Mound Study (RPMS): Access Database (2014)
DATASET Uploaded by: adam brin

The RMPS Database is the centralized database for project information and for excavation and laboratory results. This relational database stores two primary data types and the relationships among them. It houses RPMS provenience data (i.e., where artifacts and samples were located horizontally and vertically within the archaeological contexts). The database also contains information about the artifacts and sample collected during the archaeological investigation. The database structure centers...